BTO Interior Design Singapore

Design and renovation for new BTO flats, planned before you collect your keys so you can move in sooner. Renovation works are carried out by our partner V On Construction Pte. Ltd., listed in HDB’s Directory of Renovation Contractors.

TL;DR
  • Plan your BTO design before key collection so works can start soon after you get the keys.
  • A standard BTO renovation is typically about $25,000 to $67,000 depending on flat size.
  • Renovation works are carried out by our DRC-listed partner V On Construction Pte. Ltd.
BTO living and dining room with built-in shelves
Warranty satisfaction badge
Singapore service badge
Living room with a cream modular sofa, round coffee table and line-art painting

BTO Interior Design Singapore: Renovation Timeline

  1. Before key collection. Finalise the layout, carpentry and materials from your floor plan, so works can start soon after you get the keys.
  2. Key collection. Inspect for defects first and report them to the Building Service Centre before renovation starts. Use our BTO defects checklist.
  3. Open your SP utilities account. HDB will not grant a renovation permit for a new flat until it is open.
  4. Permit and works. Our DRC-listed partner applies for the permit. In newly completed blocks, permitted works must be completed within 3 months.
  5. Carpentry, curtains and move-in. Carpentry is installed after the wet works, then curtains, lights and cleaning.

BTO Renovation Cost (2026)

BTO flatTypical standard renovation
3-room BTOAbout $25,000 to $43,000
4-room BTOAbout $40,000 to $56,000
5-room BTOAbout $45,000 to $67,000

These are market ranges. Carpentry is often the largest single item, around a third of the budget. Our BTO renovation cost guide breaks the costs down.

What to Check in a BTO Renovation Package

  • Carpentry measured in foot run, with the material (laminate, board type) and internal fittings listed.
  • What is excluded, such as debris haulage, protection works, electrical points and plumbing.
  • Who holds the HDB permit, and that the contractor is in the DRC.
  • Payment stages tied to completed work, not a large upfront deposit.

Only need the basics? Our fixed-price BTO move-in packages cover curtains, a drying rack, drilling and furniture assembly without a full renovation.

BTO Rules to Know

  • Toilet floor and wall finishes cannot be replaced for 3 years from block completion. Overlay is the usual alternative.
  • Wall hacking needs an HDB permit, and structural walls cannot go. Check with our Can I hack this wall? tool.
  • The 1-year defects liability period starts at key collection. Check your dates with our BTO defect period checker.

Areas We Cover

We take BTO interior design jobs islandwide. Our workshop is at Mandai Estate, so Woodlands, Yishun, Sembawang and Admiralty are the quickest for us to reach, and we regularly cover Punggol, Sengkang, Ang Mo Kio, Tampines, Bedok, Jurong and the rest of Singapore.

Frequently Asked Questions

When should I start planning my BTO interior design?

Before key collection. Finalising the layout and carpentry early lets works start soon after you get the keys and open your SP utilities account.

How much does a BTO renovation cost?

Market ranges in 2026 are about $25,000 to $43,000 for a 3-room, $40,000 to $56,000 for a 4-room and $45,000 to $67,000 for a 5-room BTO, depending on scope.

How long does BTO renovation take?

Permitted works in newly completed blocks must be finished within 3 months of the permit date. How long the whole job takes depends mostly on the amount of carpentry.

Can I change the toilet tiles in my BTO?

Not for the first 3 years from block completion. You can overlay new tiles in the meantime.

HomeySG enquiry

Service area Singapore
WhatsApp +65 8561 0630

This opens WhatsApp with your details filled in. You can attach photos there for a faster quote. See our privacy policy.

Prefer to call? +65 8561 0630