The developer’s defects list and the MCST are not the same permission
HDB’s one-year defects period does not automatically cover a condo. The sale contract does. MCST by-laws are a separate consent for renovation. We do not inspect for the developer and we do not sit on the council. Silicone after an item is closed is S$80 to S$150.

Photo: ProjectManhattan, CC BY-SA 3.0, via Wikimedia Commons. An HDB common corridor. It is not a photograph of a named town on these pages.
How it works
- 1
Send one photo per task, the block, and whether the home is HDB, condo or landed. Say if keys were collected this month.
- 2
We match a band already printed on HomeySG, or we say quote on inspection.
- 3
Developer defects, hacking, a new layout and permit windows are named. They are not folded into a handyman visit.
- 4
You confirm the scope before anyone comes. Curtains, blinds and roller shades stay off the booking.
What this job actually is
Last updated 31 October 2026.
Buyers collect condo keys and search with HDB language. The walk-through feels the same. The office that answers is not. HDB publishes the 1-year period, the one-month report, and the “usually less than 2 weeks” repair note for newly completed HDB flats. A condominium developer owes what the sale and purchase contract says they owe. People Also Ask repeats “what is the 12 month defects liability period?”. Twelve months is a phrase in the search box. It might match your contract and it might not. This guide will not help you by pretending it always matches. Ask the developer’s defects team, in writing, what they still rectify, and do it before a renovator covers the wall. Homey Furnishing does not file that form. A private inspection company, if you hire one, sets its own fee. That fee is quote on inspection here, and we do not call any firm the best.
The MCST is the second door. By-laws can require notice, a deposit, protection for the lift, and a refusal of facade changes, bathroom hacks, or certain floor build-ups, whether or not the developer is still fixing chips. The condo by-laws guide already on this site walks through deposits and handyman limits. Use it when the question is “may I renovate?”. Use this guide when the question is “is this chip still the developer’s, or is it now mine, and is the council a third party?”. The answers can differ. A chipped tile in the unit can be a defect. A chipped tile in the corridor can be common property. Painting the corridor is not your viewing touch-up. A bathroom hack can be both a defects mistake, if you cover their work, and a by-law breach, if you never asked the council.
URA’s notes on renovating landed houses are a third system: planning permission for some landed changes, and no planning permission for replacing windows and doors when area, setback and position stay the same. A condo is not a landed house. Do not show a landed owner that window sentence and assume a condo management will accept a new facade frame. BCA’s window rules still exist when the window type needs an approved contractor. Interior silicone at S$80 to S$150 does not replace a frame. A hinge at S$60 to S$120 does not replace a council consent. A half-day of closed defect items at S$480 to S$780 is a repair day, not a renovation permit.
Legal phrases that appear beside these searches, including latent defects and protections after a defects period, are for a lawyer if you think the contract was breached. We do not interpret the contract. We also do not advise on CPF renovation withdrawals, on what a condo is worth after 50 years, or on which developer to buy from. If a crack looks structural, stop and use a qualified person. Our hairline band of S$150 to S$400 is a dry, stable paint crack only. Common-property leaks are the MCST’s report, the same way an HDB stack leak can be the town council. Pay us for an in-flat fitting that matches a row after the right party has been told.
Homey Furnishing Pte. Ltd. (ACRA UEN 202018148K), 27 Mandai Estate, #06-10 Innovation Place, Singapore 729931, invoices permit-exempt maintenance. V On Construction Pte. Ltd. (ACRA UEN 201611708H), on the HDB Directory of Renovation Contractors, invoices hacking, a new layout, and other work that needs an HDB renovation permit. Homey Furnishing is not a Council for Estate Agencies licensed estate agent and does not sell, rent or market flats. It is not a Ministry of Manpower licensed employment agency and does not place helpers.
Curtains, blinds and roller shades are not part of this booking. This page also does not sell or rent the home, and it does not place a domestic worker.
What to do first
Write two headings on the photo list: developer, and MCST. Do not merge them into one WhatsApp album without labels.
- Find the defects clause and the deadline in the sale contract.
- Report unit defects to the developer before paint or silicone.
- Read the by-laws before any hack, facade film, or noisy work.
- Label common-property photos for the MCST, not for us.
- After an item is closed, match a published band or send the PDF.
| What you see | Safe check | Stop |
|---|---|---|
| Chip on collection day | Developer | Do not book a patch yet |
| Closed item, black silicone | Our zone | S$80 to S$150 |
| Want to hack the bathroom | MCST first | Quote on inspection |
| Corridor ceiling drip | MCST | Not an in-flat paint band |
HDB, condo and landed
The building changes the permission. It does not invent a second price.
| Question | HDB | Condo | Landed |
|---|---|---|---|
| Condo | Contract for defects. By-laws for renovation. Both can apply. | We do neither approval. | In-flat bands come third. |
| New HDB | Use the HDB defects page. Do not ask the MCST. | One year from keys. | Report before renovation. |
| Landed | Contract if it was a new house. URA if the work needs permission. | No MCST unless it is strata landed. | Say which it is. |
Key collection, without a fake checklist
The developer’s letter says what to bring to key collection. We will not add a universal list of marbles, moisture meters and blue tape as if it were official. A phone photo of each mark is what you will wish you had. If their officer walks with you, let them see the mark. Filling it the night before is the same mistake as on an HDB defects month.
Once you are allowed to renovate, noisy work follows the by-laws, which may be stricter than HDB’s Saturday rule. Do not import HDB’s 9am to 6pm as a right. Ask the management office. Our booking will follow the stricter hour. Curtains, blinds and roller shades are still not part of the booking, even when a defects letter mentions window coverings the developer did not supply.
How you're charged
How you're charged
A job that already has a sentence on HomeySG uses that sentence. The hour is not added on top of a band unless the written scope says so. There is no fuel surcharge. A whole-flat repaint, a private defect-scan fee, and a litre of a named paint brand are not in the catalogue.
| Charge | What it covers | 2026 |
|---|---|---|
| Per hour | Permit-exempt handyman time when no job band matches | S$45/hr |
| Minimum charge | One task on one visit | S$55 |
| Small hole patch and repaint | The ceiling-page hole sentence | S$150 to S$280 |
| Hairline or stain, leak already fixed | The ceiling-page paint sentence | S$150 to S$400 |
| Handover reset | The package on the move-in page, by flat size | From S$298 |
| Anything without a row | A full repaint, a scan fee, a new membrane | quote on inspection |
Who may do the work
Who is allowed to do the work
HDB’s important information on renovation says renovation in a flat, including some work that does not need a permit, is carried out by a contractor from the Directory of Renovation Contractors. The same page says failing to use a listed contractor for renovations, or breaching the renovation rules, can lead to a fine of up to $5,000. That sentence is HDB’s. It is not a ruling on your flat. Read the page before you treat a handyman visit as a renovation.
- Permit-exempt maintenance that already has a band, such as a hinge, a silicone joint or a small hole patch, stays on the Homey Furnishing invoice.
- Hacking, a new layout, and replacement of toilet finishes inside HDB’s restriction period move to V On Construction Pte. Ltd. UEN 201611708H. The price of that permit scope is quote on inspection.
- A new cable or a consumer unit is an EMA licensed electrician. A new water point is a PUB licensed plumber. Piped gas is a licensed gas worker.
- Window installation and replacement on an HDB flat is a BCA approved window contractor on HDB’s directory, with a renovation permit first. BCA describes workhead RW01. Homey Furnishing is not that contractor.
- Selling, renting or marketing the flat is estate agency work. CEA registers property agents. We do not do that work.
- A weekly cleaner on this site is not a migrant domestic worker placement. We do not hire out helpers.
- Curtains, blinds and roller shades are not part of this booking.
Ways to keep the bill smaller
Ways to keep the bill smaller
- Photograph every mark before you book a full repaint. A hole that matches the S$150 to S$280 sentence does not need a whole-flat price.
- Put several permit-exempt tasks on one visit. The S$55 call-out is one task. Further permit-exempt time is S$45 an hour, not a second trip.
- Report a new-flat defect to HDB, or the developer if the contract says so, before you pay anyone to cover it.
- Do not hack a bathroom floor to “save” a later leak. HDB’s three-year restriction exists so the flat below stays dry.
- Do not hack a bathroom because the defects period is open. An open period is a reason to wait, not a reason to strip the floor.
WhatsApp the photos to +65 8561 0630.
Price, or quote on inspection
Nothing in the contract period is priced as if the developer had already refused it. Ask them first.
Anything not in that table is quote on inspection.
| Scope already published | 2026 band in the repo | Where it lives |
|---|---|---|
| Developer defects while the clause is open | Their process | Not our invoice |
| Silicone after closure | S$80 to S$150 | Defect calculator |
| Hinge after closure | S$60 to S$120 | Door repair |
| Half-day closed punch-list | S$480 to S$780 | Defect rectification |
| MCST-approved hack | quote on inspection | Permit or by-law scope |
| Private scan fee | quote on inspection | Not sold here |
WhatsApp the photos to +65 8561 0630. The reply uses a band already printed on HomeySG, or it says quote on inspection.

Related pages
Frequently Asked Questions
How to check for defects in a new condo?
Use the developer’s key-collection process and the defects clause. Photograph marks and report them before any cover-up. We do not sell the inspection.
What is the developer’s defect liability period?
The period in your sale contract. HDB’s one year from key collection is for newly completed HDB flats, not a default for condos.
What is the 12 month defects liability period in construction?
It is a phrase in search results. It applies to your condo only if the contract says so. Read the contract.
What are the rules for condo renovation in Singapore?
The MCST by-laws, plus building rules where the work needs them. Our by-laws guide covers deposits. This page only separates that consent from the defects list.
Can you renovate a bathroom in a condo?
Only with the permissions the estate and the law require. We do not approve it. A hack is quote on inspection. It is not something to do during an open defects period.
What are the MCST renovation rules for condos?
They are the by-laws of that development. Read them, or the management’s renovation form. We cannot quote a national MCST price or a national consent.