Cat6 LAN points, mesh backhaul and ceiling projectors
Cat6 installation in Singapore is S$180 to S$320 for the first point from the fibre ONT through existing telco conduit, with an RJ45 faceplate and a link test, and S$140 to S$240 each when two or more points share the visit. A bomb-shelter mesh backhaul is S$220 to S$420. A ceiling projector and a 90 to 120 inch motorised screen, with the ceiling reinforced, is S$350 to S$780.

A dead bedroom, a dead shelter, or a projector on a weak board
Wi-Fi mesh without a cable still dies in an HDB bomb shelter. A motorised screen hung only on plasterboard screws is the other failure. Both are cabling and structure, not a new router.
| What you see | Likely cause | What to do first / typical cost |
|---|---|---|
| Study or bedroom is on Wi-Fi only | The ONT is at the DB and the conduit is empty | First Cat6 or Cat6A point: S$180 to S$320 |
| Bomb shelter has no signal | Concrete kills the mesh hop | Wired backhaul and micro-trunking: S$220 to S$420 |
| Projector mount flexes the ceiling | The screen load is on the board, not the slab | Reinforced mount and concealed HDMI: S$350 to S$780 |
| Several rooms need a point | Same pull, same afternoon | S$140 to S$240 each from the second point |
2026 network and projector bands
We use the concealed telco conduit where it is continuous. Surface micro-trunking is the fallback, and it is in the dead-zone band. A new electrical circuit, if the projector needs one, is priced on the DB page.
| Job | 2026 SGD band | Inclusions |
|---|---|---|
| Cat6 or Cat6A point from the fibre ONT | S$180 to S$320 | Pull through existing concealed telco conduit, RJ45 keystone faceplate, and a Fluke or link test. S$140 to S$240 each when two or more points share the visit. |
| Bomb-shelter or concrete dead-zone wired backhaul | S$220 to S$420 | Mesh Wi-Fi wired backhaul and neat micro-trunking where the shelter wall kills the signal. |
| Ceiling projector and motorised screen, 90 to 120 inch | S$350 to S$780 | Epson, BenQ, Sony or XGIMI mount, false-ceiling reinforcement, and concealed HDMI and power for a motorised screen. |
Cat6 LAN points, mesh backhaul and ceiling projectors: access and preparation
Cat6 LAN points, mesh backhaul and ceiling projectors stays on the circuit that is already in the board unless the load needs a new way. A like-for-like lamp, a faceplate, or a 30mA device swap is an electrician’s visit. A new circuit, a DB change, or an EV charger is EMA-licensed electrical work and is not a DIY extension lead.
Access to the board, the length of a new cable, and whether the building requires an LEW test change the visit. A condo may restrict drilling of the riser. An HDB flat still follows SS 638 and the EMA 30mA rule. Landed houses add distance from the intake to the point.
- Photo of the DB door and the schedule
- Note which appliance was on when it tripped
- Do not reset a burning smell
- Clear a path to the board
- Say if the home is HDB, condo or landed
Plan Cat6 LAN points, mesh backhaul and ceiling projectors
Confirm which rooms die, and whether the trip happens in the rain or with one appliance.
Isolate before the cover comes off. The test button on a 30mA device is a homeowner check. Opening the board is the electrician.
Replace or repair the fitting that matches the fault. Do not bridge a protective device.
Label the way, test, and leave the cover on.

- Cat6 or Cat6A point from the fibre ONTS$180 to S$320
- Bomb-shelter or concrete dead-zone wired backhaulS$220 to S$420
- Ceiling projector and motorised screen, 90 to 120 inchS$350 to S$780
| Access | HDB | Condo | Landed |
|---|---|---|---|
| Board | Many HDB boards are 12-way and already full. | MCST may require the licensed electrician’s form and quiet hours. | The intake and the sub-board can be far apart. Measure the run. |
| Protection | EMA 30mA protection applies, including pre-1985 flats. | The same device rule. The management office may ask for notice. | Outbuildings and wet outdoor points need the correct enclosure, not an indoor faceplate. |
| New circuits | A new cable is electrical work, not a handyman spur. | The building may ban surface trunking in common corridors. | A charger or a workshop circuit is designed, not tapped off a socket. |
- Photo of the DB door and the schedule
- Note which appliance was on when it tripped
- Do not reset a burning smell
- Clear a path to the board
- Say if the home is HDB, condo or landed
Frequently Asked Questions
How much is one Cat6 point in an HDB flat?
A point pulled from the fibre ONT through existing conduit, terminated on an RJ45 keystone and link-tested, is S$180 to S$320. Extra points on the same visit are S$140 to S$240 each.
Can you mount a projector in a false ceiling?
Yes, when the mount and the motorised screen are reinforced to the structure. Epson, BenQ, Sony and XGIMI installs with concealed HDMI and power are S$350 to S$780.