Booth carpentry and build, not the organiser
A custom booth, a counter or a wall for a show is quote on inspection. We are not Singapore Expo, Marina Bay Sands, Suntec, or the organiser. Their manual sets height, build-up and what you may fix to the floor. We do not copy a fee or a height we have not been given for that show.

Photo: Jorge Royan, CC BY-SA 3.0, via Wikimedia Commons. Carpenter tools in a Vienna workshop. It is not a Singapore site and not a licence.
How it works
- 1
Send one photo of each piece, the block, and whether the home is HDB, condo or landed.
- 2
We match a band already printed on HomeySG, or we say quote on inspection.
- 3
A layout change, hacking, or a built-in strip-out is named as V On Construction. A truck is not included.
- 4
You confirm the scope before anyone comes. Curtains, blinds and roller shades stay off the booking.
What this job actually is
Exhibition booth design and build is a trade-show search. The pages that rank are contractors and venue halls. Homey Furnishing can build carpentry, counters and simple walls when the drawing and the venue rules are in the same email. The price is quote on inspection. We do not publish a price per square metre of booth, a shell-scheme package, or a “3 by 3” rate. A shop showcase visit at S$250 to S$550 is not a booth. A mall overnight handyman slot is not a build-up crew.
Shell scheme and raw space are the organiser’s words. In a shell scheme the walls may already exist and the work is a graphic, a counter and a shelf. In raw space the floor is what you are given and the walls are yours to build, inside limits the manual states. We do not memorise Singapore Expo, Sands Expo and Convention Centre, or Suntec as one rule. Suntec Singapore publishes its own site, including floor plans. A floor plan is not a build-up timetable and not a permission to drill. If your show is at another hall, send that show’s exhibitor manual. We will not invent a maximum height, a rigging point, or an overtime dollar.
What we will not sign is the fire safety plan, the temporary permit, or the organiser’s contractor list. A double-storey booth, a rig that crosses a gangway, or a wall that hides an exit is a submission for the venue and for SCDF where the code says so. We do not certify it and we do not quote a clause number we have not read on your approval. SCDF’s household-shelter clause is a home rule. It is not the exhibition code. Do not mix them. BCA’s building-works page is the permanent-building question. A booth that is a temporary structure in a hall is the venue’s temporary-works rule, which we will read when you send it and will not replace with a guess.
Furniture inside the booth is separate. Hired tables and chairs are not our stock. We do not rent them. If they arrive flat-packed and match an assembly band, that band applies: a small item S$50 to S$80, a table that is actually a small item, not a 3 metre counter. A carpenter counter is quote on inspection. The rental versus custom guide draws that line. Electrical distribution for the stand is an electrician. We do not hide a distribution board in the carpentry.
HDB and home renovation do not govern a hall. HDB’s renovation page matters only if the “booth” is actually a cabinet in a flat. A fine of up to $5,000 is that home rule. A void-deck roadshow is the roadshow page and the town council, not this hall. Curtains used as a drape are not sold here. A timber or printed backdrop is the backdrop page if that is the whole job.
Homey Furnishing Pte. Ltd. (ACRA UEN 202018148K), 27 Mandai Estate, #06-10 Innovation Place, Singapore 729931, invoices permit-exempt furniture assembly and repair. V On Construction Pte. Ltd. (ACRA UEN 201611708H), on the HDB Directory of Renovation Contractors, invoices an HDB renovation permit when the work is a new layout, hacking, or a built-in strip-out. Homey Furnishing is not a removal company and does not publish a truck rate.
Curtains, blinds and roller shades are not part of this booking. Fabric window treatments are a different product, and these pages do not quote them.
What to do first
Look at the piece in the room. Do not drag a tall wardrobe across a wet floor to test it.
- Send the hall, the show, and the manual’s height and fixing lines.
- Say shell scheme or raw space.
- Keep fire exits on the drawing.
- Separate carpentry, electrics, and hired furniture.
- Expect a quote. Not a per-square-metre rate.
| What you see | Safe check | Stop |
|---|---|---|
| Custom wall, counter or booth | Build | quote on inspection |
| Hired flat-pack that is small | Assembly | S$50 to S$80 if it is small |
| Double storey or a blocked exit | Venue and fire submission | We do not certify it |
| Shop showcase hardware only | Shop page | S$250 to S$550 |
HDB, condo and landed
The building changes the permission and the disposal path. It does not invent a second price.
| Question | HDB | Condo | Landed |
|---|---|---|---|
| Expo hall | That show’s manual. We do not publish its overtime. | We are not the organiser. | Electrics are an electrician. |
| Suntec or Sands | Same. Suntec publishes floor plans. A plan is not a drilling permit. | Send the manual. | No shared height across halls. |
| A flat or a shop | This is the wrong page. Use carpentry or the shop pages. | HDB rules apply at home. | A mall kiosk is the roadshow page. |
What to send so the quote is about your show
The drawing, the booth number if you have it, the manual page that states height and floor fixing, and whether graphics are printed by someone else. A mood board without dimensions is not a quote. If the manual forbids timber, do not ask for a timber wall.
Build-up and tear-down dates are the organiser’s. We do not publish a number of hours a booth takes. The setup guide says how to read a timetable you were given. It does not replace it. A steel frame for the same stand is metal fabrication, quoted on its own, not folded into the timber price.
How you're charged
How you're charged
A furniture job that already has a sentence on HomeySG uses that sentence. Nothing in this table is a fuel surcharge, and the handyman hour is not added on top of a band unless the written scope says so. IKEA publishes its own checkout fee. That percentage is not a HomeySG band.
| Charge | What it covers | 2026 |
|---|---|---|
| Published furniture band | The photo matches a row already on a furniture page | That row |
| Bed frame assembly | The bed row on the furniture assembly page | S$80 to S$150 |
| Wardrobe assembly | The wardrobe row, confirmed from photos | S$100 to S$650 |
| Cabinet door alignment | The hinge-adjustment visit on cabinet repair | S$50 to S$100 |
| Soft-close slides, 1 to 3 drawers | The drawer-runner page | S$110 to S$220 |
| Dining chair seats, 4 to 6 | Seat re-upholstery, not a new sofa | S$240 to S$480 |
| Custom carpentry, a truck, a full sofa re-cover, or rattan binding | No catalogue row for that product | quote on inspection |
Who may do the work
Who is allowed to do the work
The permit guide on this site already splits hardware from a renovation. A cabinet hinge, a gas strut and a drawer runner do not need an HDB renovation permit when the layout stays. A new kitchen or bathroom layout, hacking, or removing a wall does. Fines for unauthorised work are already written there as up to S$5,000. Homey Furnishing does not sign the permit invoice.
- Flat-pack assembly uses the furniture assembly catalogue. Tall units are wall-anchored on that visit. A separate anti-tip price is not printed, except the child-gate and anti-tip bundle at S$180 to S$420 when that bundle is the job.
- A built-in that has to come off the wall can become a strip-out. That is V On Construction if the flat is HDB and the work needs a permit. A loose shelf inside a carcass is not a strip-out.
- Town councils collect some bulky loose items on their own rules. We are not the collector, and we do not publish their fee.
- A new cable inside a wardrobe is an electrician. Assembly does not include a new circuit.
- Do not anchor into a household shelter wall. The permit guide already keeps TV brackets and shelves off that wall.
- A hollow partition or a false ceiling is a poor anchor for a tall wardrobe. If the fixing cannot reach structure, the visit stops.
- Active termites are not painted over. Skirting and door-frame replacement after damage uses the termite page bands. We do not claim to be the pest-control operator.
- Curtains, blinds and roller shades are not quoted here.
Ways to keep the bill smaller
Ways to keep the bill smaller
- Photograph every piece before a carpenter is booked. A hinge visit is not a new kitchen.
- Put the flat-pack in the room where it will stand. Carrying a built wardrobe down an HDB corridor is a second job.
- If the drawer only sticks, use the published slide row. A new carcass is the cabinet page, and only when the board is swollen.
- Book the town council bulky slot before you pay anyone to truck a loose sofa. Many councils collect a limited number of loose items. Built-ins are usually excluded.
- Send the organiser’s height and fixing rules with the drawing. A booth that ignores them is the wrong booth.
WhatsApp the photos to +65 8561 0630.
Price, or quote on inspection
There is no booth rate. Neighbouring rows are assembly and shop hardware.
Anything not in that table is quote on inspection.
| Scope already published | 2026 band in the repo | Where it lives |
|---|---|---|
| Custom booth, wall or counter | quote on inspection | No per-square-metre rate |
| Small hired flat-pack | S$50 to S$80 | Only if it is small |
| Shop showcase hardware | S$250 to S$550 | Not a booth |
| Venue overtime or shell scheme | Not published | The organiser’s manual |
WhatsApp the photos to +65 8561 0630. The reply uses a band already printed on HomeySG, or it says quote on inspection.

Related pages
Shell upgrades, storage and launch sets
This page is the stand. A shell upgrade, a stored booth and a ballroom launch are different drawings. All of them are quote on inspection. The manual still sets the height.
Frequently Asked Questions
How much does an exhibition booth cost in Singapore?
Quote on inspection. We do not publish a price per square metre or a shell-scheme package.
Are you the Singapore Expo builder?
No. We are not the venue and not the show organiser. The manual for that show sets height, build-up and fixing. Send it.
Can you do Sands and Suntec?
The build is quote on inspection if the manual allows the drawing. Suntec publishes floor plans on its site. A floor plan is not permission to drill. Sands is the same: send that show’s rules.
Do you handle the fire certificate?
No. A double-storey stand or a blocked exit is a submission we do not certify.
Is furniture included?
Hired furniture is not our stock. We do not rent it. A carpenter counter is quote on inspection. A genuinely small flat-pack is S$50 to S$80.