Fascia and wall signs on a shopfront
A fascia panel and a flat wall sign are quote on inspection. The bulkhead is structure. The shutter guide is not. We mount and remove panels. We do not fabricate them here.

Photo: Phil Sellens, CC BY 2.0, via Wikimedia Commons. An uncovered fascia in Hastings. It is not a Singapore shophouse and not a reinstatement price.
How it works
- 1
Send the shopfront width, the bulkhead height, and photos of the shutter in the open and closed positions.
- 2
We say quote on inspection. There is no fascia-board band.
- 3
If the only place the screws will bite is the shutter guide or a conserved ornament, the panel does not go up.
- 4
You confirm the quote. A new illuminated panel still needs an electrician when the cable is new.
What this job is
“Shopfront fascia sign” and “fascia board replacement” are searched by people who can see a stained panel and want it swapped before opening day. The panel itself, aluminium composite, folded aluminium, acrylic or a timber board, is a maker’s product. This page is how that panel is taken off and how the next one is fixed. Both are quote on inspection. A timber fascia on a house eave is a different trade and a different word. If your photo is a roof edge, say so. This page is the shopfront.
The shopfront is a stack. At the bottom, the shutter or the glass. Above it, a bulkhead of steel or masonry, often skinned with aluminium. Above that, the beam or the five-foot-way soffit. The fascia should land on the bulkhead. Fitters who are late screw the top of the panel into the soffit lining and the bottom into the shutter hood or the guide. The lining is not structure. The guide is a precision part. Either screw line fails, one by dropping the panel and one by making the shutter roar. The shutter page is where a damaged guide is actually priced. Do not create that job with a sign screw.
Wall signs on the pier are individual letters or a small panel beside the entrance. HDB allows a sign on the shop front wall beside the entrance door as one of three positions, and it states sizes for the position above the front door and the position above the rear door. Read the live A&A page before you cut a pier panel, because the beside-the-door size is easy to misread in a summary. Conserved piers follow URA: a sign on the column face cannot be larger than the column, and a projecting sign from a first-storey column is limited to 600 mm wide, brackets 200 mm, on the left as viewed from the road, with 2,500 mm headroom.
Curtains, blinds and roller shades are not part of this booking.
How the work is done
Taking the old panel off is half the visit. Scores of short screws, a bead of silicone, and sometimes the old tenant’s letters still on the face. Cut the silicone. Support the panel before the last screws leave, because a 3 metre composite sheet is light until it is airborne and then it is a sail. Behind it you often find the previous fascia, paint, and holes that do not line up with the new drawing. Those holes are filled when they match the small-hole sentence, S$150 to S$280, or left as part of a micro-reinstatement, S$1,800 to S$4,500, when the lease is ending and that is the scope. Covering them with the new panel without telling the landlord what is under it is how yield-up arguments start.
The new panel is pre-drilled to a template taken from the bulkhead, not from the old panel’s holes if those holes missed the steel. Fixings are into the steel or the masonry at the spacing the panel maker states for the span. A composite panel that spans more than the maker allows without a stiffener will pillow. Pillow reads as a cheap sign even when the print is good. Good work is a flat face, even joints if the run is in sections, and a shadow gap that does not collect water against the shutter hood. Sloppy work is a packer of plywood visible from the walkway, a joint that smiles, and a screw through the printed logo because the template was mirrored.
Illuminated fascias are lightboxes turned sideways. The same rules apply: a drain, a reachable driver, an isolator, and an electrician for a new cable at S$220 to S$450 when the circuit sentence matches. A non-lit panel does not need a driver. Do not let a package add “LED upgrade” by routing a lead through the shutter hood. The hood is wet and full of the barrel. Cables do not share it.
On a conserved front the panel may not be the right object at all. URA’s shopfront rule puts the sign in the transom. A full-width lightbox fascia that covers the transom, the frieze and the ornament is the sign the guideline is written to stop. If the permission says transom, we mount in the transom. If there is no permission, we do not discover the rule after the composite is cut. The approval guide is the sequence. This page is the screws.
| What you should see at the end | What a sloppy visit leaves | Why it matters |
|---|---|---|
| Panel fixed to bulkhead steel or masonry | Screws in the shutter guide or hood | The shutter roars or jams |
| Old holes acknowledged | New panel hiding a row of failed anchors | Yield-up finds them |
| Face flat, template not mirrored | A screw through the logo, a smiling joint | The panel looks temporary |
| Lit fascia has a drain and an isolator | Cable through the shutter barrel | Water and the motor share a path |
How to scope it
Photograph the whole shopfront, the pier, and the soffit. Open and close nothing yourself if the shutter is stiff. Say whether the panel is one piece or must be split to pass a staircase entrance. A conserved shophouse with a side stair is the case URA draws separately from a full-width shopfront. Name which one you have.
If the old panel is staying and you only want new vinyl on it, that is closer to the repair page than to a new fascia. Vinyl on a pillowing panel will pillow too. Say if the panel is flat. Measure the clear height from the walkway to the underside of any projecting panel. BCA’s 2.5 metre figure and HDB’s 2.60 metre figure are not interchangeable. Use the one that applies.
| What you see | What to photograph | Stop |
|---|---|---|
| Flat bulkhead, steel found, non-lit panel | Span and fixing spacing | Quote on inspection |
| Only the shutter guide offers a screw line | Stop | Do not use the guide |
| Old panel off, previous paint and holes | Hole size | Patch S$150 to S$280 if it matches, otherwise quote |
| Conserved transom shorter than the proposed panel | URA position | Recut the design. Do not cover the frieze |
| Lit fascia, no isolator | Cable route | Electrician before the face is closed |
Which job you actually have
A fascia replacement and a wall sign beside the door are different holes.
| Situation | Use this | Leave this alone |
|---|---|---|
| New panel on a sound bulkhead | quote on inspection | A per-foot fascia price from another trade |
| Letters on the pier | 3D letter page | A full-width panel to carry three letters |
| Vinyl on a flat existing panel | Repair page | A new tray |
| Shutter rubbing after a previous sign | Shutter page | More screws in the guide |
| Lease end, panel off, holes left | Removal and reinstatement | A new tenant’s panel over the holes without a note |
Questions a business should ask
Questions a business should ask
Ask before the composite is routed.
- Where is the structure in the bulkhead, and have you found it with more than a magnet?
- Will any screw land in the shutter guide, hood or barrel?
- What is under the old panel?
- Is the building conserved, and does the sign sit in the transom?
- What is the underside height above the walkway?
- Is the panel lit, and who pulls the cable?
- Who fabricates, and is the print already matched to the measured width?
Fascias that the building will not accept
A panel that fits the opening can still be the wrong panel for the guideline.
| Front | Panel | Limit | We will not |
|---|---|---|---|
| Ordinary shop bulkhead | Into steel or masonry | Off the shutter | Skin-deep screws |
| HDB front door | Within the stated height and shop width | 2.60 m clearance on HDB’s page | A deeper box that breaks the clearance |
| Conserved shopfront | Transom, or above the door if it was a house | No wider than the door on a residential front | A fascia across the ornament |
| Five-foot way projection | 2.5 m on BCA’s verandah-way rule, 2,500 mm on URA’s hanging-sign rule | Whichever applies | A low tray because the logo looked small |
Rules that apply
BCA’s supporting page sets projection and height over footpaths, verandah-ways and drains. URA’s conservation page sets the shopfront, column, frieze and five-foot-way positions, including 2,500 mm to the underside of a hanging sign. HDB’s A&A page sets shop signboard positions and the 600 mm by shop-width limit above the front entrance. A panel has to satisfy the rule for the building it is on, then the fixing has to satisfy the wall. We do not pick the friendlier number.
Building works that are not insignificant still need a qualified person under BCA’s general guidance. A panel on existing bulkhead steel is usually not a structural alteration. A new steel frame tied into the facade, or a tray that trips the 10 square metre or 4 metre Permit To Use tests, is a different submission. We stop and say so. Electrical work on a new cable is an EMA licensed electrician.
Official pages
- URA: signs in conservation areas
- URA: five-foot-way sign headroom
- BCA: sign projection rules, Permit To Use and licence fees
- BCA: outdoor advertising sign and signboard licence
Homey Furnishing Pte. Ltd. (ACRA UEN 202018148K), 27 Mandai Estate, #06-10 Innovation Place, Singapore 729931, invoices the permit-exempt visit. V On Construction Pte. Ltd. (ACRA UEN 201611708H), on the HDB Directory of Renovation Contractors, invoices hacking, a new layout, and an HDB renovation permit. Homey Furnishing is not a property agency, not a CEA practice, and not a MOM-licensed employment agency.
How you're charged
How you're charged
A job that already has a sentence on HomeySG uses that sentence. The hour is not added on top of a band unless the written scope says so. There is no fuel surcharge and no published night premium except the mall overnight row.
| Charge | What it covers | 2026 |
|---|---|---|
| Per hour | Permit-exempt handyman time after a priced task, if the scope says so | S$45/hr |
| Minimum, one task | One permit-exempt task on one visit | S$55 |
| Mall overnight | Permit-to-work admin and one hardware fix when the mall requires the night slot | S$380 to S$650 |
| A matching catalogue row | The photo matches a row already printed | That row |
| A term contract, a sign, a plain office closer, a mineral ceiling tile | No catalogue row for that product | quote on inspection |
The panel is quote on inspection. Holes that match the patch sentence, a mall night that matches the overnight row, and a circuit that matches the DB page keep those bands. They are not fascia extras.
Ways to keep the bill smaller
Ways to keep the bill smaller
- Find the steel before the panel is cut. A panel drilled to the wrong centres is scrap.
- Strip the old silicone while the panel is off. Painting over it telegraphs through the new face.
- Keep the shutter path in the photos you send. A second visit to free a guide costs more than a careful first hang.
- If the lease ends inside a year, ask whether a raceway of letters is easier to remove than a full composite fascia.
WhatsApp the photos to +65 8561 0630.
Price, or quote on inspection
The fascia has no row. These do, when the photo matches.
Anything not in that table is quote on inspection.
| Scope already published | 2026 band in the repo | Where it lives |
|---|---|---|
| The sign, letters, face, vinyl or neon | quote on inspection | No fabrication band and no mounting band |
| Small hole patch after a fixing comes out | S$150 to S$280 | Only when the photo matches that patch sentence |
| Micro-reinstatement at lease end | S$1,800 to S$4,500 | Reinstatement page, when the lease asks for that scope |
| Mall overnight, permit-to-work admin and one hardware fix | S$380 to S$650 | Only when the mall’s ask matches that row |
| Dedicated circuit, when a new cable is required | S$220 to S$450 | DB page. An EMA licensed electrician does the cable |
WhatsApp the photos to +65 8561 0630. The reply uses a band already printed on HomeySG, or it says quote on inspection.

Related pages
Frequently Asked Questions
How much does it cost to replace a shop fascia in Singapore?
Quote on inspection. The panel is a maker’s line if it is new. Taking the old one off and fixing the next one are quoted from the bulkhead, not from a per-foot band.
Can you screw the sign into the roller shutter?
No. The guide, the hood and the barrel are not anchor points. Screws there make the shutter rub. The bulkhead structure is the fixing.
What will I find under the old fascia?
Often an older panel, paint and holes, which is what the Hastings photograph shows in another city. Holes that match the small-patch sentence are S$150 to S$280. A lease-end strip-out is the reinstatement band if that is the scope.
Where does a sign go on a conserved shophouse?
URA’s shopfront rule puts it in the transom. An original residential front takes a sign above the door, no wider than the door. Projecting column signs have the 600 mm and 2,500 mm limits on that page.
Is a house roof fascia the same job?
No. This page is a shopfront panel. A roof-edge board is a different trade. Send a photo if you are not sure which word you mean.
Do you supply the aluminium composite panel?
Fabrication is quote on inspection from a maker. We mount, remove and, where the panel is staying, repair.