Rotted door frames and waterproof skirting, without hacking
Door frame and skirting replacement in Singapore is S$240 to S$580 for 10m to 30m of waterproof polymer or WPC skirting, and S$260 to S$480 to splice a rotted lower jamb in nyatoh or WPC. A full WPC or powder-coated aluminium frame is S$450 to S$780. A whole-unit skirting and architrave restoration after termites is S$680 to S$1,350.

Soft timber at the floor is the tell
A screwdriver that sinks into the jamb at skirting height is rot or termites. Painting over it feeds the next swarm. The wall does not need to come out.
| What you see | Likely cause | What to do first / typical cost |
|---|---|---|
| Lower jamb crumbles, paint bubbles | Mop water or a slow leak into cellulose | Splice 1 to 2 doorways: S$260 to S$480 |
| Whole frame is powdery | Termites have taken the rebate | WPC or aluminium frame, no hacking: S$450 to S$780 |
| Skirting swells after mopping | Timber is the wrong material on a wet floor | 10m to 30m polymer or WPC: S$240 to S$580 |
| Several rooms after a termite treatment | The food source is still on the wall | Whole-unit restoration: S$680 to S$1,350 |
2026 frame and skirting bands
This is a non-hacking replacement. Bedroom partitions and bathroom wall tiles stay. A pest-control chemical treatment, if the colony is active, is booked with the pest company and is not inside these bands.
| Job | 2026 SGD band | Inclusions |
|---|---|---|
| Rotted lower door jamb splice, 1 to 2 doorways | S$260 to S$480 | Cut out the rotten architrave, splice waterproof solid nyatoh or WPC, epoxy consolidation and repaint. |
| Full door frame to WPC or powder-coated aluminium | S$450 to S$780 | One bedroom or bathroom frame. No wall hacking. Termite-proof WPC or powder-coated aluminium. |
| Waterproof skirting, 10m to 30m | S$240 to S$580 | Termite-eaten or mop-swollen timber skirting replaced with high-density polymer or WPC timber-grain board. |
| Whole-unit skirting and architrave restoration | S$680 to S$1,350 | Post-termite skirting and architrave package for the flat. Walls stay. The cellulose food source goes. |
Rotted door frames and waterproof skirting, without hacking: access and preparation
Rotted door frames and waterproof skirting, without hacking is hardware and carcass work when the kitchen or wardrobe layout stays put. Hinges, runners, a door leaf in the same opening, and a sectional under-sink rebuild do not need an HDB renovation permit. A new layout, a hacked wall, or a moved gas point does.
Brand-matched hardware takes longer to identify than a generic cup hinge. A soft carcass under a leak is a different visit from a dry door that only needs alignment. Condo management may care about noise and disposal of the old board. Landed houses add stair cupboards and taller doors.
- Photo of the hinge or runner stamp
- Count the doors or drawers that fail
- Note a leak under the sink if the board is soft
- Clear the work area
- Say HDB, condo or landed
Plan Rotted door frames and waterproof skirting, without hacking
Read the stamp before ordering a look-alike hinge or runner.
Protect the floor and empty the cabinet that has to come open.
Replace the failed part. Do not rebuild the kitchen because two doors sag.
Check that doors close, drawers stay on the runner, and overhead flaps stay up.

- Rotted lower door jamb splice, 1 to 2 doorwaysS$260 to S$480
- Full door frame to WPC or powder-coated aluminiumS$450 to S$780
- Waterproof skirting, 10m to 30mS$240 to S$580
- Whole-unit skirting and architrave restorationS$680 to S$1,350
| Access | HDB | Condo | Landed |
|---|---|---|---|
| Permit | Layout unchanged: no HDB permit. A new kitchen layout is V On Construction. | MCST quiet hours and a lift for sheet material. | No HDB permit. A structural opening is still not carpentry. |
| Board | HDB kitchens are often 16mm particleboard with a melamine face. | The same moisture problem, plus a management rule on debris. | Older landed joinery may be solid timber. Match the repair to the timber, not to a flat-pack hinge. |
| Hardware | Count hinges and photograph the angle before anyone buys a set. | Service lifts close early. Book the slot before the parts arrive. | Tall doors need a second person. Do not hang them alone. |
- Photo of the hinge or runner stamp
- Count the doors or drawers that fail
- Note a leak under the sink if the board is soft
- Clear the work area
- Say HDB, condo or landed
Frequently Asked Questions
Can a rotted door jamb be repaired without a new wall?
Yes. The lower jamb is cut out and spliced in waterproof nyatoh or WPC, then painted. One or two doorways are S$260 to S$480.
Does skirting replacement need an HDB permit?
No, when the walls are not hacked. A 10m to 30m waterproof skirting run is S$240 to S$580.