Mounting a lightbox sign
A lightbox is quote on inspection. The face, the LEDs and the hanging are separate failures. We mount and repair. We do not fabricate the box in this catalogue.

Photo: Helene.3160, CC BY-SA 4.0, via Wikimedia Commons. An illuminated box being fitted. It is not a Singapore licence and not a HomeySG circuit.
How it works
- 1
Send the width, height, depth and weight, and a photo of the wall or bulkhead and of the nearest isolator.
- 2
We say quote on inspection. There is no lightbox band.
- 3
A new mains cable stops the job until an EMA licensed electrician is on the same plan.
- 4
You confirm the quote. If the old face only needs LEDs, that is the repair page, not a new box.
What this job is
Searches for “lightbox signage Singapore price” and “light box signage price” want a fabrication number. Makers publish their own ranges. None of those ranges are on this site. Mounting a tray that already exists, or opening one that has gone dark, is quote on inspection. If someone has folded a new face, a new tray and a night hang into the S$55 call-out, that sentence is wrong. The S$55 figure is a single permit-exempt task that already has a sentence. A lightbox is not that task.
The object is simple and people still mis-name it. The tray is the structure. The face is a printed acrylic or a tensioned fabric held by a retainer or a clip frame. Inside, LED modules are stuck or screwed to the tray back, wired in strings to a driver that turns mains into the voltage the modules want. A fluorescent lightbox that still has tubes is the same tray with a different lamp. Replacing tubes with LED modules is the usual repair, and it is not automatic: the old ballast comes out, the modules need a flat bed, and the driver needs air. The repair page is the right page when the tray is sound and only the lamp has failed.
BCA’s licence page treats an outdoor lightbox as a signboard or an advertisement depending on what is printed on it. A business name is argued as a signboard. A product brand is an advertisement. BCA’s fee-computation examples include a lightbox as one way of measuring area. The fee, if ALS says one is due, is paid to BCA. Projection over a verandah-way or footpath must not be less than 2.5 metres above that surface, which is the figure on BCA’s supporting page. HDB shops add their own 2.60 metre clearance and a 600 mm maximum height above the front door. Both can apply. The stricter one governs.
Curtains, blinds and roller shades are not part of this booking.
How the work is done
The tray is offered up only after the anchors are in structure. On a concrete beam or a brick pier, the holes are marked from the tray’s brackets, drilled, and fitted with anchors rated for the weight in shear, because a projecting box loads the top anchors in tension. On a steel shopfront bulkhead, the fixings are self-drilling screws or bolts into the steel, not into the aluminium cladding that is only a skin. A bracket screwed into the roller-shutter guide is refused. The guide is an alignment for the curtain. It is not a beam. Good work leaves the shutter running and the tray still when you push the bottom edge. Sloppy work leaves a sway, a packer made of scrap wood, and a screw in the guide.
The face is the part tenants notice and the part fitters rush. A rigid acrylic face sits in a retainer. If the retainer is short of screws, the face bows in the sun and the print cracks. A fabric face is tensioned in a frame. A fabric face that is only taped in will sag after rain. Print is on the inside face where the sun cannot bleach it as fast, unless the maker designed an external vinyl. External vinyl that is peeling is a vinyl failure, not an LED failure. Do not replace modules because the print has faded. The repair page separates those two.
Drainage is a hole or a gap at the bottom of the tray, with a path that does not pour onto the shutter motor. Trays without a drain fill, the modules sit in water, and the face stains in a tide mark. A drain that is sealed “to keep insects out” with no mesh is the same failure. Insects are a mesh problem. Water is a hole problem. Silicone smeared around the whole perimeter, including the bottom, is how fitters create the tide mark.
The driver is mounted so the terminals can be reached without dropping the tray. A driver screwed behind the modules, accessible only by destroying the face, is the sloppy version. Mains comes from an isolator you can switch off without opening the tray. If that isolator does not exist and a new cable is required, stop. The dedicated-circuit sentence on the DB page is S$220 to S$450 when the work matches it, done by an EMA licensed electrician. Homey Furnishing does not land the driver on a trailing socket inside the ceiling void. A like-for-like driver swap on an existing suitable supply, with the tray isolated, is still quote on inspection. It is not the circuit band, and it is not a handyman lamp change.
| What you should see at the end | What a sloppy visit leaves | Why it matters |
|---|---|---|
| Tray fixed to structure and the shutter still runs | Screws in the shutter guide | The curtain rubs |
| Face seated, print inside unless designed otherwise | Face bowed, retainer missing screws | The print cracks |
| A drain at the bottom, driver reachable | Silicone all round and the driver buried | Water and a dead driver |
| An isolator you can switch | A lead in the ceiling void | The next person cannot make it safe |
How to scope it
Measure the opening the box must fit, not only the box. A tray that is 2,400 mm wide on a bulkhead that is 2,200 mm between piers does not “trim on site” if the face is already printed. Send the pier-to-pier dimension. Say whether the old tray stays. Replacing a face on an old tray is a different visit from hanging a new tray beside the old one and leaving both.
If the box is dark, say whether it is dark in one patch, flickering, or dead. A patch is often one module string. A dead box is often the driver or the supply. Photograph the isolator with the power off and the tray closed. Do not open a wet tray. Mall units that can only be worked at night use the mall overnight row, S$380 to S$650, only when the mall wants permit-to-work admin and one hardware fix. A lightbox hang is often more than one hardware fix, so expect quote on inspection even when the night slot is real.
| What you see | What to photograph | Stop |
|---|---|---|
| New tray, solid bulkhead, existing isolator | Weight and pier width | Quote on inspection for the hang |
| Dark patch inside a sound tray | Which string is out | Repair page. Not a new tray |
| Tide mark inside the face | Whether the bottom is sealed | Open a drain. Do not reprint first |
| No isolator, cable drawn to the DB | The board | Electrician. S$220 to S$450 only if it is that circuit |
| Box deeper than the verandah allows, underside under 2.5 m | BCA projection figure | Stop. Do not hang it low to suit the logo |
Which job you actually have
Most lightbox jobs are one of four visits. Name it before you ask for a price.
| Situation | Use this | Leave this alone |
|---|---|---|
| New tray to hang | quote on inspection | No supply-and-install package on this site |
| Face faded, LEDs even | Reprint or a new face, quote on inspection | New modules for a print problem |
| Patch of darkness | Module or string repair | A new tray |
| Whole box dead, supply present | Driver, quote on inspection | The dedicated-circuit band |
| New cable required | S$220 to S$450 if it matches, via an electrician | A handyman hour |
| Lease ending | Removal page, then holes | Leaving the tray for the next tenant without asking the lease |
Questions a business should ask
Questions a business should ask
Ask anyone pricing a lightbox these questions.
- Is the tray staying, or is the whole box new?
- What does it weigh, and what are the anchors going into?
- Where is the isolator, and is the cable existing?
- Can the driver be changed without destroying the face?
- Does the bottom drain, and where does the water go?
- Is the underside at least 2.5 m above the footpath, and 2.60 m if HDB states that for this shop?
- Who fabricates the face, and is that invoice separate?
Where a lightbox is not just a bigger letter
The same tray is a licence question outdoors and a landlord question in a mall.
| Place | Check | Then | We will not |
|---|---|---|---|
| Five-foot way or open corridor | BCA outdoor definition and 2.5 m projection rule | Quote the hang | Hang it at head height |
| HDB shop front | 600 mm height above the front door, 2.60 m clearance, non-flicker | Quote | Add a chasing border |
| Mall bulkhead | Mall manual and night access | Quote, night row only if it matches | Drill common property on a verbal yes |
| Inside a fully enclosed room | BCA’s outdoor definition may not apply. Confirm in ALS | Quote the hang anyway | Skip the landlord because you think it is indoor |
Rules that apply
BCA’s supporting page states the 2.5 metre figures for signs in a verandah-way, over a footpath, and over a roadside drain, and the projection limits of 60 cm or 1.5 m depending on height above the street. A Permit To Use, applied for by a professional engineer through CORENET, is required before the licence when the sign exceeds 10 square metres and is supported by an advertising structure, or the structure exceeds 10 square metres, or its highest point is 4 metres or more above the surface it stands on. A small shop lightbox is often under those tests. A large tray on a frame is often over them. We do not stamp the engineer’s drawing.
Flickering, flashing and running lights are on BCA’s prohibited list except on the streets BCA points to in URA’s circulars. A lightbox that simply stays on is not a running light. A lightbox with a chasing programme is. SCDF exit signs are a different product under clause 8.1 and SS 563. Do not put a shop face in an exit-sign housing. Electrical work on a new cable is an EMA licensed electrician.
Official pages
- BCA: outdoor advertising sign and signboard licence
- BCA: sign projection rules, Permit To Use and licence fees
- URA circular DC21-04: outdoor signs and BCA advertisement licensing
- SCDF Fire Code 2023 clause 8.1: exit lighting and exit signs
Homey Furnishing Pte. Ltd. (ACRA UEN 202018148K), 27 Mandai Estate, #06-10 Innovation Place, Singapore 729931, invoices the permit-exempt visit. V On Construction Pte. Ltd. (ACRA UEN 201611708H), on the HDB Directory of Renovation Contractors, invoices hacking, a new layout, and an HDB renovation permit. Homey Furnishing is not a property agency, not a CEA practice, and not a MOM-licensed employment agency.
How you're charged
How you're charged
A job that already has a sentence on HomeySG uses that sentence. The hour is not added on top of a band unless the written scope says so. There is no fuel surcharge and no published night premium except the mall overnight row.
| Charge | What it covers | 2026 |
|---|---|---|
| Per hour | Permit-exempt handyman time after a priced task, if the scope says so | S$45/hr |
| Minimum, one task | One permit-exempt task on one visit | S$55 |
| Mall overnight | Permit-to-work admin and one hardware fix when the mall requires the night slot | S$380 to S$650 |
| A matching catalogue row | The photo matches a row already printed | That row |
| A term contract, a sign, a plain office closer, a mineral ceiling tile | No catalogue row for that product | quote on inspection |
The tray, the face and the modules are quote on inspection. The circuit band and the mall-night band apply only when the photo matches those sentences.
Ways to keep the bill smaller
Ways to keep the bill smaller
- Reprint the face before you scrap the tray. A sound tray with dead modules is a repair.
- Specify a reachable driver and a bottom drain in the maker’s drawing. Both are cheaper in the workshop than on a ladder.
- Measure between the piers before the face is printed.
- Switch off at an isolator. A visit that starts by finding the breaker is longer than a visit that starts at a labelled switch.
WhatsApp the photos to +65 8561 0630.
Price, or quote on inspection
Nothing in the catalogue is a lightbox. These rows are the neighbours.
Anything not in that table is quote on inspection.
| Scope already published | 2026 band in the repo | Where it lives |
|---|---|---|
| The sign, letters, face, vinyl or neon | quote on inspection | No fabrication band and no mounting band |
| Dedicated circuit, when a new cable is required | S$220 to S$450 | DB page. An EMA licensed electrician does the cable |
| Mall overnight, permit-to-work admin and one hardware fix | S$380 to S$650 | Only when the mall’s ask matches that row |
| Small hole patch after a fixing comes out | S$150 to S$280 | Only when the photo matches that patch sentence |
| Micro-reinstatement at lease end | S$1,800 to S$4,500 | Reinstatement page, when the lease asks for that scope |
WhatsApp the photos to +65 8561 0630. The reply uses a band already printed on HomeySG, or it says quote on inspection.

Related pages
A new tray is not this mounting visit
This page mounts a lightbox that already exists. Making the frame is quote on inspection on the fabrication page. A mall overnight slot is one hardware fix, not a new tray.
Frequently Asked Questions
How much does a lightbox sign cost in Singapore?
Quote on inspection. No lightbox price is published. Fabrication, if you need a new tray or face, is a maker’s line. Mounting is separate.
My lightbox is dark in one corner. Do I need a new sign?
Often no. A patch is a module string or a connection. A whole black box is more often the driver or the supply. Open it only after it is isolated. The repair is quote on inspection.
Can you replace the fluorescent tubes with LED?
Yes when the tray is sound. The ballast comes out, the modules need a flat bed, and the driver needs air. That visit is quote on inspection. It is not a published tube price, because no tube price is in the catalogue.
How high does a lightbox have to be?
BCA’s supporting page says a sign fixed in a verandah-way or over a footpath shall not be less than 2.5 metres above that level. HDB’s shop page says signboard clearance must be at least 2.60 metres above floor level. Use the rule that applies to the building, and the higher one if both apply.
Who wires it?
A new cable is an EMA licensed electrician. The dedicated-circuit band is S$220 to S$450 only when the work matches that sentence. An existing isolator is not a new circuit.
Does a lightbox need a BCA licence?
If it is an outdoor signboard or advertisement and no exemption on BCA’s page applies, yes. Area and whether the print is a business name or a brand decide the category. ALS is where that is confirmed, not in a chat message.