Ceiling boards in offices and shops

A ceiling board in an office or shop is repaired after the water stops. A false-ceiling board section is S$250 to S$650. A small hole is S$150 to S$280. A whole-ceiling plaster price is not published. A loose mineral-fibre tile is quote on inspection.

4.9

trusted by 500+

An emptied office with a suspended ceiling grid and bare floor

Photo: Np6824, CC BY-SA 4.0, via Wikimedia Commons. An emptied office with a tile grid. It is not a Singapore lease handover and not a measured reinstatement.

HDB licensed renovation contractor badge
Warranty satisfaction badge
Singapore service badge

How it works

  1. 1

    Send a photo of the stain or the hole, and say whether the ceiling is plasterboard, a tile grid, or bare concrete.

  2. 2

    We match a printed board, hatch or stain row, or we say quote on inspection.

  3. 3

    A live leak, a sagging slab, or a crack you can see moving is not painted over.

  4. 4

    You confirm the scope. The flat above, the roof, or the landlord may own the water even when we own the paint.

What this job is

1. Stop the water 2. Name the board 3. Fix to the frame 4. Paint last
Find the board before you price the stain

Office and shop ceilings in Singapore are usually one of four things. Plasterboard or gypsum board on a light-steel frame. Mineral-fibre tiles in a T-bar grid. A cement or calcium-silicate board in a wet room. Or the concrete soffit, painted, with no lining at all. The repair follows the board. A price for “the ceiling” without that name is how a tile job gets billed as a plasterboard section.

The ceiling repair page already prices a home: a small hole S$150 to S$280, a hairline or a water stain after the leak is fixed S$150 to S$400, a hinged heater hatch S$180 to S$350, a sagging L-box re-anchored S$220 to S$450, a false-ceiling board section S$250 to S$650, and a small spalling patch S$150 to S$300. An MCST clubhouse or gym hatch is S$220 to S$550. Those sentences still apply when the room is an office or a shop and the photo matches them. What this page adds is how to tell the boards apart and when the sentence does not match.

People ask how to repair a broken ceiling board, what a plaster ceiling costs, and how to know a crack is serious. The method is below. A square-metre plaster rate for a whole soffit is not in the catalogue.

Curtains, blinds and roller shades are not part of this booking.

How the work is done

Water is identified before the board is closed. A brown ring that is still damp, a drip into a bucket, or a stain that grew after the last rain means the source is still open. The source may be the unit above, a roof, a condensate tray, or a pipe in the void. Painting that ring is the visit that fails. Supply-pipe work, when the pipe itself must be moved or renewed, is a PUB licensed plumber. Reconnecting what is already there can be maintenance. We say which one it is from the photo of the pipe, not from the colour of the stain.

A gypsum board is cut back to sound sheet and the new piece is screwed into the metal channel or timber, not into the ragged edge of the old board. Joints are taped. Screw heads are set just below the face, not driven through the paper. A patch that relies on the broken edge sags. The published board section is S$250 to S$650 for that kind of replacement. A small hole that does not need a new sheet is S$150 to S$280. An L-box that has dropped off its hangers is re-anchored at S$220 to S$450. Hangers that are only tied to another ceiling tile are the sloppy version.

A mineral-fibre tile in a grid lifts out. If the tile is stained and the grid is straight, the honest line is often a replacement tile. No per-tile price is printed, so that line is quote on inspection. Do not force the S$250 to S$650 board sentence onto a 600 mm tile. If the grid itself has opened, or the hanger wire has slipped, say so. A tile screwed to the T-bar to stop it rattling is a mark of a short visit. The tile has to sit in the grid so the next person can lift it.

A crack in a concrete soffit is a different object from a crack in a board. Spalling with exposed, rusty steel is the small spalling row only when it matches that sentence, S$150 to S$300. A crack that runs out of a beam, a soffit that has deflected, or rust that is more than a small patch is not filled and forgotten. We are not the structural engineer. The visit stops. A hairline in paint, after the leak has actually stopped, is S$150 to S$400.

What you should see at the endWhat a sloppy visit leavesWhy it matters
The new board is fixed to the frame and the joint is tapedScrews only in the broken edgeThe patch drops
The stain is painted after the board is dryPaint on a damp ringThe ring returns
A grid tile lifts out for the next tradeTile screwed to the T-barThe void becomes inaccessible
A hatch is hinged where a heater or a valve must be reachedA cutout taped shutThe next leak needs another hole

How to scope it

Photograph the ceiling from below and, if a tile lifts safely from the floor without a ladder over a stair, one photo of the void. Do not climb. Say office, shop, food shop, or condo unit. A food shop’s ceiling still has to stay cleanable. We will not leave open insulation over a preparation table. A mall unit may only allow the work at night. That night is the mall row, S$380 to S$650, plus the board row. It is not included inside S$250.

Count the sheets or the tiles. “The whole ceiling looks old” is not the board-section sentence. One section is S$250 to S$650. A room of tiles with no per-tile row is quote on inspection. A heater above a bathroom ceiling that has no hatch is the hatch sentence, S$180 to S$350, which is a home and condo detail that also appears in offices with a pantry tank.

What you seeWhat to photographStop
Brown ring, board still dampWhere the water arrivesDo not paint. Find the source first
A hole in gypsum with the frame visibleThe channel spacingBoard section S$250 to S$650 if the sheet is the repair
One stained grid tile, grid still straightThe tile sizeQuote on inspection. Not the plasterboard row
Concrete rust stain and a crack from a beamThe crack’s pathStop. Not a S$150 paint visit
No opening under a storage heaterThe tank locationHatch S$180 to S$350 if that is the job

Which job you actually have

Name the board. The price is the board’s sentence.

SituationUse thisLeave this alone
Gypsum sectionS$250 to S$650Not a grid tile
Small holeS$150 to S$280Not a new ceiling
Stain after the leak has stoppedS$150 to S$400Not while it is wet
Sagging L-boxS$220 to S$450Hangers into the slab or the frame
Heater hatchS$180 to S$350Not tape over the cut
Mineral-fibre tilequote on inspectionNo per-tile band
Whole-ceiling plasterquote on inspectionNo square-metre rate
Water from the unit aboveBoard price only after the source is agreedThe leak guide says who to call

Questions a business should ask

Questions a business should ask

Ask anyone pricing a ceiling these questions.

  1. Is the lining plasterboard, a mineral tile, or concrete?
  2. Has the leak stopped, and who is repairing the source?
  3. Which printed sentence is the quote, and how many sheets or tiles does it cover?
  4. Will the fixings reach the frame or the slab?
  5. Will a grid tile still lift out afterwards?
  6. Is a hatch required for a valve or a heater, and is that a separate row?
  7. If this is a mall, is the night row written separately?
  8. Are you claiming the crack is structural? If yes, who is the engineer? We are not.

Office void, shop, or the flat above

The board price is the same. The person who owns the water changes.

SettingWhat we can priceWho else is involvedWatch
Office gridBoard section if it is plasterboard. Tile is quote on inspectionLandlord if the void is theirsDo not screw tiles shut
Shop, including foodSame bands, with the ceiling left cleanableMall night row if access is after hoursNo open insulation over food
Condo unitHatch and board rowsThe flat above or the MCST if the slab is commonRead the leak guide before you argue the invoice
Concrete soffitSmall spalling S$150 to S$300 when it matchesAn engineer if the crack leaves a beamPaint is not a structural repair

Rules that apply

A leak from above is explained on the ceiling-leak guide. In an HDB block the upper flat, the town council and the owner of the ceiling finish are not the same person. In a condo the slab may be common property. We make good the board we are instructed to make good. We do not decide the neighbour’s liability.

BCA’s insignificant-works page is the right place to start if someone proposes to cut a new opening through structure for a ladder or a duct. A board patch is not that opening. The attic-ladder page already says a new structural hole is outside its install band. PUB licensed plumbers remain the trade for a new or relocated water pipe.

MOM’s pathway duty matters when a ladder stands in a shop aisle or an office corridor. The occupier provides a safe route. We do not leave a ladder in a fire exit. No response time is published.

Official pages

Homey Furnishing Pte. Ltd. (ACRA UEN 202018148K), 27 Mandai Estate, #06-10 Innovation Place, Singapore 729931, invoices the permit-exempt visit. V On Construction Pte. Ltd. (ACRA UEN 201611708H), on the HDB Directory of Renovation Contractors, invoices hacking, a new layout, and an HDB renovation permit. Homey Furnishing is not a property agency, not a CEA practice, and not a MOM-licensed employment agency.

How you're charged

How you're charged

A job that already has a sentence on HomeySG uses that sentence. The hour is not added on top of a band unless the written scope says so. There is no fuel surcharge and no published night premium except the mall overnight row.

ChargeWhat it covers2026
Per hourPermit-exempt handyman time after a priced task, if the scope says soS$45/hr
Minimum, one taskOne permit-exempt task on one visitS$55
Mall overnightPermit-to-work admin and one hardware fix when the mall requires the night slotS$380 to S$650
A matching catalogue rowThe photo matches a row already printedThat row
A term contract, a sign, a plain office closer, a mineral ceiling tileNo catalogue row for that productquote on inspection

The board section, the hole and the hatch are separate rows. A mineral tile does not inherit the plasterboard price, and the hour is not added on top of a matching row unless the scope says so.

Ways to keep the bill smaller

Ways to keep the bill smaller

  • Stop the leak before you book paint. Paint on a wet board is a second visit.
  • Lift one tile and photograph the void if you can do it safely from the floor. The photo tells gypsum from fibre.
  • Ask the upstairs unit or the MCST about the water before you pay for a ceiling that will stain again.
  • Replace one section. A whole new ceiling is quote on inspection and is rarely the first spend.

WhatsApp the photos to +65 8561 0630.

Price, or quote on inspection

Home and commercial rooms share these board sentences. The tile does not.

Anything not in that table is quote on inspection.

Scope already published2026 band in the repoWhere it lives
Small holeS$150 to S$280Ceiling repair
Stain repaint after the leak has stoppedS$150 to S$400Ceiling repair
False-ceiling board sectionS$250 to S$650Ceiling repair
L-box re-anchoredS$220 to S$450Ceiling repair
Heater hatchS$180 to S$350Ceiling repair
Small spalling patchS$150 to S$300Ceiling repair
Clubhouse or gym hatchS$220 to S$550MCST page
Mineral-fibre tilequote on inspectionNo per-tile row
Whole-ceiling plasterquote on inspectionNo square-metre rate

WhatsApp the photos to +65 8561 0630. The reply uses a band already printed on HomeySG, or it says quote on inspection.

An emptied office with a suspended ceiling grid and bare floor
A suspended grid in an emptied office. A stained tile is not automatically the board-section pricePhoto: Np6824, CC BY-SA 4.0, via Wikimedia Commons. An emptied office with a tile grid. It is not a Singapore lease handover and not a measured reinstatement.

Related pages

Frequently Asked Questions

How to repair a broken ceiling board?

Cut back to sound gypsum, screw the new piece into the metal frame, tape the joint, and paint when it is dry. That board section is S$250 to S$650. A mineral-fibre tile is quote on inspection.

How to repair a gypsum ceiling?

The same way: frame, screws, tape. Screws driven only into the broken edge are the patch that falls. Stop if the board is still wet.

How much does it cost to fix a broken ceiling?

A small hole is S$150 to S$280. A board section is S$250 to S$650. A stain, once the leak has stopped, is S$150 to S$400. A whole ceiling is quote on inspection.

How much does it cost to plaster a ceiling in Singapore?

No whole-ceiling plaster price is published. The rows above are patches and sections. A square-metre rate in a message is not a HomeySG band.

Who is responsible for a condo ceiling leak in Singapore?

The ceiling-leak guide sets out the usual split between the flat above, the MCST and the ceiling finish. We price the board after the source is identified. We do not rule on the neighbour’s bill.

How can you tell if a ceiling crack is structural?

A crack that leaves a beam, a soffit that has dropped, or widespread rust is not a paint visit. We stop. A hairline in paint after a leak has stopped can be S$150 to S$400. We are not structural engineers.

Tell us what you need help with

This opens WhatsApp with your details filled in. You can attach photos there for a faster quote. See our privacy policy.

Prefer to call? +65 8561 0630