When a metal gate, rail or stair needs approval
A snapped hinge is a repair. A new gate, a new rail height, or a new stair is not. Hinge welding is S$180 to S$350 when the leaf can be propped. Handrail re-anchoring is S$250 to S$480. We do not approve works for HDB, an MCST or BCA. We say which path the photo is on.

Photo: ProjectManhattan, CC BY-SA 3.0, via Wikimedia Commons. An HDB common corridor. It is not a photograph of a named flat, and bulky items do not belong in it.
How it works
- 1
Send one photo of each piece, the block, and whether the home is HDB, condo or landed.
- 2
We match a band already printed on HomeySG, or we say quote on inspection.
- 3
A layout change, hacking, or a built-in strip-out is named as V On Construction. A truck is not included.
- 4
You confirm the scope before anyone comes. Curtains, blinds and roller shades stay off the booking.
What this job actually is
Last updated 31 October 2026.
Metalwork approval is the search behind “does a new gate need an HDB permit” and “can the condo stop my railing”. The answer depends on whether you are repairing a leaf or making a new one. The gate welding page prices a dropped hinge at S$180 to S$350 and calls that hinge repair metalwork, not an HDB renovation. A new leaf, new posts, or a gate that swings into a common corridor is a different sentence. HDB’s renovation page says renovation, including some work that does not need a permit, is carried out by a contractor on the Directory of Renovation Contractors, and that failing to use a listed contractor for renovations, or breaching the rules, can lead to a fine of up to $5,000. That is HDB’s sentence. V On Construction is the company on that directory that invoices the permit. Homey Furnishing invoices the exempt repair. Applying for approval is how the permit is lodged. We do not lodge it under the repair invoice.
Stairs and balconies are where BCA enters. The staircase repair page already says BCA Approved Document Section C expects barriers at 1.0 m or more, with clamps and balusters that do not deflect loosely, and that a new barrier design or a height change is permit work. Re-anchoring what is already there is S$250 to S$480 for a handrail and S$350 to S$780 for an intact glass balustrade. We will not design a lower rail to suit a view. BCA’s page on building works that do not need plan approval is the list to read before a fabricator calls a new flight “maintenance”. If the work is on that list or not, the page says so. We do not rewrite the list from memory.
A condo is not HDB. The MCST’s by-laws decide facade colour, balcony screens and whether a gate at a strata lot is even yours to change. We do not vote on the council and we do not publish their deposit. A deposit they ask for is not a fabrication price. Send their written answer with the photos if you have it. If you do not, the quote will say the metal is quote on inspection and the approval is yours to obtain. URA’s planning rules for an outdoor structure on a landed house are a separate question from an HDB gate. We do not give planning advice. If the structure is a storey, a roof or a boundary wall, stop and ask a qualified person. A loose rack in a kitchen is not that structure.
Fire and the shelter cut across all three. SCDF clause 7.2 limits works in a household shelter. A steel rack bolted into the shelter wall, or a gate that stops the shelter door, is refused. A railing that blocks an exit in a shop or a hall is not a furniture decision. Exhibition structures are the venue guide. We do not certify a fire plan. Window grilles are the window pages, including HDB window rules and an approved window contractor where the grille is part of that window work. Do not order a “security grille” on this page and expect the window permit to be included.
What you can usefully send is small. A photo of the existing leaf, the swing into the corridor, whether the posts are yours, and whether anyone has already said yes. We will match a repair band or we will say quote on inspection and name the permit if the photo shows a new barrier. We will not write “HDB approved” on an invoice. Curtains, blinds and a Zip track are not a gate.
Homey Furnishing Pte. Ltd. (ACRA UEN 202018148K), 27 Mandai Estate, #06-10 Innovation Place, Singapore 729931, invoices permit-exempt furniture assembly and repair. V On Construction Pte. Ltd. (ACRA UEN 201611708H), on the HDB Directory of Renovation Contractors, invoices an HDB renovation permit when the work is a new layout, hacking, or a built-in strip-out. Homey Furnishing is not a removal company and does not publish a truck rate.
Curtains, blinds and roller shades are not part of this booking. Fabric window treatments are a different product, and these pages do not quote them.
What to do first
Look at the piece in the room. Do not drag a tall wardrobe across a wet floor to test it.
- Say repair or new.
- Photograph the swing into the common space.
- If it is a condo facade, get the MCST’s answer in writing.
- Do not treat a new stair as a handrail re-anchor.
- Keep shelter walls and exit routes clear.
| What you see | Safe check | Stop | |
|---|---|---|---|
| Snapped hinge, same leaf | Weld | S$180 to S$350 | |
| New gate leaf or posts | May be a renovation | quote on inspection | and possibly V On |
| Loose handrail, same height | Re-anchor | S$250 to S$480 | |
| New height or a new flight | Permit | Not a repair |
HDB, condo and landed
The building changes the permission and the disposal path. It does not invent a second price.
| Question | HDB | Condo | Landed |
|---|---|---|---|
| HDB | Directory contractor and the renovation page if it is a renovation. | Corridor swing matters. | Windows and grilles are a different permit. |
| Condo | MCST first for anything on the facade or balcony. | We do not publish their deposit. | Repair bands still apply when the photo matches. |
| Landed | No HDB renovation permit. URA and BCA can still apply to a new structure. | Autogate motors stay on the autogate page. | A new leaf is still a quote. |
What this guide will not sign
It will not sign an HDB permit, an MCST form, or a BCA submission. It will not say your gate is approved because a similar gate exists downstairs. It will not quote URA a fee or a processing day. Those numbers are not in this catalogue.
It will not turn a welding photo into a licence. We do not publish a welding licence class. Mains work inside an autogate controller stays on the autogate page, which already points at EMA practice for that controller. A new circuit is an electrician.
How the fabrication pages use this split
Mild steel, stainless and aluminium each have a service page. All three send a new piece to quote on inspection and a matching repair to the band that already exists. Use this guide when the question is permission. Use those pages when the question is the metal.
A shop shutter is not a house gate. The commercial shutter page is the shop. A mall overnight slot is not a licence to weld in a corridor at night.
How you're charged
How you're charged
A furniture job that already has a sentence on HomeySG uses that sentence. Nothing in this table is a fuel surcharge, and the handyman hour is not added on top of a band unless the written scope says so. IKEA publishes its own checkout fee. That percentage is not a HomeySG band.
| Charge | What it covers | 2026 |
|---|---|---|
| Published furniture band | The photo matches a row already on a furniture page | That row |
| Bed frame assembly | The bed row on the furniture assembly page | S$80 to S$150 |
| Wardrobe assembly | The wardrobe row, confirmed from photos | S$100 to S$650 |
| Cabinet door alignment | The hinge-adjustment visit on cabinet repair | S$50 to S$100 |
| Soft-close slides, 1 to 3 drawers | The drawer-runner page | S$110 to S$220 |
| Dining chair seats, 4 to 6 | Seat re-upholstery, not a new sofa | S$240 to S$480 |
| Custom carpentry, a truck, a full sofa re-cover, or rattan binding | No catalogue row for that product | quote on inspection |
Who may do the work
Who is allowed to do the work
The permit guide on this site already splits hardware from a renovation. A cabinet hinge, a gas strut and a drawer runner do not need an HDB renovation permit when the layout stays. A new kitchen or bathroom layout, hacking, or removing a wall does. Fines for unauthorised work are already written there as up to S$5,000. Homey Furnishing does not sign the permit invoice.
- Flat-pack assembly uses the furniture assembly catalogue. Tall units are wall-anchored on that visit. A separate anti-tip price is not printed, except the child-gate and anti-tip bundle at S$180 to S$420 when that bundle is the job.
- A built-in that has to come off the wall can become a strip-out. That is V On Construction if the flat is HDB and the work needs a permit. A loose shelf inside a carcass is not a strip-out.
- Town councils collect some bulky loose items on their own rules. We are not the collector, and we do not publish their fee.
- A new cable inside a wardrobe is an electrician. Assembly does not include a new circuit.
- Do not anchor into a household shelter wall. The permit guide already keeps TV brackets and shelves off that wall.
- A hollow partition or a false ceiling is a poor anchor for a tall wardrobe. If the fixing cannot reach structure, the visit stops.
- Active termites are not painted over. Skirting and door-frame replacement after damage uses the termite page bands. We do not claim to be the pest-control operator.
- Curtains, blinds and roller shades are not quoted here.
Ways to keep the bill smaller
Ways to keep the bill smaller
- Photograph every piece before a carpenter is booked. A hinge visit is not a new kitchen.
- Put the flat-pack in the room where it will stand. Carrying a built wardrobe down an HDB corridor is a second job.
- If the drawer only sticks, use the published slide row. A new carcass is the cabinet page, and only when the board is swollen.
- Book the town council bulky slot before you pay anyone to truck a loose sofa. Many councils collect a limited number of loose items. Built-ins are usually excluded.
- Do not start a new balcony rail because a contractor said approval is “normally fine”. Ask the MCST or HDB.
WhatsApp the photos to +65 8561 0630.
Price, or quote on inspection
Approval is not a line on the invoice. These are the repairs that are already priced.
Anything not in that table is quote on inspection.
| Scope already published | 2026 band in the repo | Where it lives |
|---|---|---|
| Hinge weld, existing leaf | S$180 to S$350 | Autogate page |
| Handrail re-anchor | S$250 to S$480 | Stair page |
| Intact glass balustrade | S$350 to S$780 | Stair page |
| New gate, new rail, new stair | quote on inspection | Permit may apply |
| HDB, MCST or BCA fee | Not published | Ask them |
WhatsApp the photos to +65 8561 0630. The reply uses a band already printed on HomeySG, or it says quote on inspection.

Related pages
Frequently Asked Questions
Does a new metal gate need an HDB permit?
A hinge repair on the existing leaf is the weld at S$180 to S$350 and is described as metalwork, not a renovation. A new leaf or a new layout can be a permit. HDB’s page is the rule. We do not grant the permit.
What railing height does BCA expect?
The stair page already states that Approved Document Section C looks for a barrier of at least 1.0 m, and that a height change is permit work. We do not publish a second figure.
Can the MCST stop a balcony rail?
Yes, if their by-laws say so. We do not vote on the council and we do not publish their deposit.
Do you submit plans to BCA?
No. If the work is a new barrier or building work, it leaves the repair invoice. V On Construction invoices an HDB renovation permit. A qualified person is for BCA submissions we do not pretend to sign.
Is a window grille this approval?
No. Grilles and window stays are the window pages, with HDB and an approved window contractor where that work requires them.
Can you fix the rail to the shelter wall?
No. SCDF clause 7.2 is the limit. A shelter wall is refused.