An office partition is not a new bedroom

Moving an existing demountable office partition is S$550 to S$1,200. Building a new room has no published price. In a private home, URA asks owners who rent to keep the approved layout. We do not give a yes or no on whether your room is legal.

4.9

trusted by 500+

A meeting room enclosed by glazed partitions

Photo: Jalso Music App, CC BY-SA 4.0, via Wikimedia Commons. A glazed meeting room. It is not a Singapore office and not a priced partition.

HDB licensed renovation contractor badge
Warranty satisfaction badge
Singapore service badge

How it works

  1. 1

    Send photos of the wall and say whether it already exists.

  2. 2

    An existing demountable adjustment uses S$550 to S$1,200 if that is the work. A new room is quote on inspection.

  3. 3

    If the room is a private home and the wall creates a lettable room, read URA’s layout note before you ask us to build it.

  4. 4

    We do not certify that a partition is legal.

What this job is

Last updated 31 October 2026.

1. Is the wall already there 2. Is it glass or gypsum 3. Check layout and fire 4. Price only the matching row
Existing suite, or a new room

“How much does it cost to partition a room in Singapore?” and “is a partition room legal?” arrive together. They should stay together. The only printed partition sentence on this site is demountable glass or gypsum partition modification: adjustment, door insertion and reseal of an office suite, S$550 to S$1,200. That is a wall the office already has, moved or cut for a door. It is not a price per foot, not a bedroom, and not a yes from URA.

A new gypsum room, in an office or a flat, has no band. Quote on inspection, and only after the layout question is faced. In a private home that is rented, URA’s renting-property page says you are encouraged to retain the approved internal layout, and that occupants must stay at least three consecutive months. A partition whose purpose is another nightly guest is the short-stay problem as well as a wall. We will not build that.

HDB flats have their own permit. The permit guide says a new layout is permit work, invoiced by V On Construction, and that unauthorised HDB work can draw a fine up to S$5,000. “Can I partition a room in HDB?” is therefore not a handyman hour. If the wall changes the layout, it is the permit path. If it is a freestanding screen that is furniture, it is furniture, and tall units are anchored as the assembly page describes. A screen is not a room with a door and a lock.

Curtains, blinds and roller shades are not part of this booking.

How the work is done

Look at what is already built. A demountable office suite has a head track, a floor track and panels. Adjustment means those tracks move or a door is inserted, then the joints are resealed. The S$550 to S$1,200 sentence is that work. It includes the reseal the glass page names. It does not include a new aircon, a new light circuit, or a new floor drain. Those are other trades. A glass door in that suite, if the door is the only fault, is alignment at S$250 to S$420 or a floor spring at S$450 to S$850. Do not buy a partition modification to fix a closer.

A new stud wall is a different sequence: track, studs, board, skim or tape, and usually skirtings and a door. None of that has a published metre rate. People ask for a standard thickness. We do not publish one. The thickness is whatever the drawing and the fire requirement say, and if there is no drawing the job is not ready. Soundproofing a room has its own page, from S$280 for a door seal up to secondary glazing. That page is not a partition price either. Do not add the two and call it a bedroom.

Fire and escape sit in the middle of the floor plan. A wall that crosses the route to an exit, or that turns one room into two without a legal exit from the inner room, is not a Saturday build. SCDF’s rules on travel distance and doors are the qualified person’s subject when the plan changes. We do not measure “it feels fine”. A coworking operator who wants four phone rooms should use booths, at S$450 to S$1,400 to relocate one that already exists, rather than invent rooms with gypsum.

Good work on a demountable suite leaves the tracks true, the glass marked if someone could walk into it, and the door latching. Sloppy work is a board screwed to a window mullion, a wall that stops short of the ceiling but is sold as a room, or a lock on a door that has no closer where a closer is required. In a flat, sloppy work is also a wall built first and a permit discussed later. The permit guide is explicit that later is how the fine arrives.

What you should see at the endWhat a sloppy visit leavesWhy it matters
Tracks are true and joints are resealedA panel forced into a bent head trackThe glass leaks sound and light at the joint
A new room has a drawing and the right approvalStuds up, permit “to follow”The permit guide warns against that order
The exit still worksA room with no lawful way outThat is not a furniture problem
Glass at head height is visibleClear glass where people turn a cornerMarking is part of a careful suite

How to scope it

Say “existing demountable” or “new wall”. Send the plan of the room and a photo of the ceiling, because a new wall has to meet structure, not a loose grid. If the address is a condominium, the MCST by-laws on renovation sit on top of URA’s layout note. A deposit the MCST holds is their money. It is not part of S$550. If the address is an HDB flat, say the flat type and whether keys were recent. A BTO layout change is the permit path.

What you seeWhat to photographStop
Existing glass suite, move a panel or add a doorTracks and the doorS$550 to S$1,200 if that is the whole job
Glass door onlyPivot and floorAlignment or floor spring, not the partition row
New gypsum room in an officeDrawing, landlord consent, fireQuote on inspection
New room in a rented condo or landed houseURA layout note and the stay ruleWe will not build an illegal short-stay room
New room in an HDB flatPermit guideV On if it is a layout change
Want a price per foot or a thicknessNo such rowQuote on inspection

Which job you actually have

The legal question and the price question use different documents.

SituationUse thisLeave this alone
Demountable office suiteS$550 to S$1,200Not a bedroom rate
New wall, any buildingquote on inspectionNo metre rate
HDB layout changePermit, V On ConstructionNot Homey’s exempt invoice
Private home, rentedKeep the approved layout, URAA partition for short stays is refused
Soundproofing an existing roomSoundproofing page, from S$280Not a new wall
Booth instead of a roomS$450 to S$1,400 to move oneNot a gypsum cell
“Is it legal?”URA, HDB, MCST, SCDF, as applicableWe do not certify

Questions a business should ask

Questions a business should ask

Ask a contractor who offers a partition price these questions before the tracks are cut.

  1. Is your price the S$550 to S$1,200 demountable sentence, or a new wall?
  2. If it is a new wall, why is there a number? None is published here.
  3. Does the wall change an approved layout?
  4. Who has approved it: landlord, MCST, HDB, or a qualified person?
  5. What happens to the exit from the inner room?
  6. Does the wall meet structure, or only the ceiling grid?
  7. Is a new circuit or a new door closer included? Those are separate.
  8. Are you willing to say you do not certify legality? You should be.

Office, HDB, condo

The same studs are a different permission in each building.

PlaceExisting suiteNew roomWho else
OfficeS$550 to S$1,200 if demountableQuote, plus landlord consentFire exit if the plan changes
HDB flatA screen that is furniture may be exemptLayout change is a permitV On, and the S$5,000 fine risk in the permit guide
Condo or landed, rentedMCST rules for noisy workURA asks you to keep the approved layoutThree-month minimum stay
CoworkingGlass suite or a boothDo not invent sleeping roomsStay page if anyone is living there

Rules that apply

URA’s renting-property page is the layout sentence for private homes: retain the approved internal layout, minimum stay three consecutive months. The short-term accommodation page is the refusal for stays under that period. HDB’s permit matrix is the flat. BCA’s insignificant-works page is the checkpoint for whether a qualified person is required. SCDF is the exit and the fire door. We cite those offices. We do not replace them with a WhatsApp “yes”.

MCST by-laws can require deposits and weekday work even when URA is silent. The condo by-law guide on this site is the deposit conversation. A partition price that ignores the deposit is incomplete as a budget, but the deposit is paid to the MCST, not to us.

Soundproof rockwool infill, when that is the job, is S$850 to S$1,950 on the soundproofing page. Door seals there start at S$280 to S$550. Those are upgrades to a room that exists. They are not permission to create the room.

Official pages

Homey Furnishing Pte. Ltd. (ACRA UEN 202018148K), 27 Mandai Estate, #06-10 Innovation Place, Singapore 729931, invoices the permit-exempt visit. V On Construction Pte. Ltd. (ACRA UEN 201611708H), on the HDB Directory of Renovation Contractors, invoices hacking, a new layout, and an HDB renovation permit. Homey Furnishing is not a property agency, not a CEA practice, and not a MOM-licensed employment agency.

How you're charged

How you're charged

A job that already has a sentence on HomeySG uses that sentence. The hour is not added on top of a band unless the written scope says so. There is no fuel surcharge and no published night premium except the mall overnight row.

ChargeWhat it covers2026
Per hourPermit-exempt handyman time after a priced task, if the scope says soS$45/hr
Minimum, one taskOne permit-exempt task on one visitS$55
Mall overnightPermit-to-work admin and one hardware fix when the mall requires the night slotS$380 to S$650
A matching catalogue rowThe photo matches a row already printedThat row
A term contract, a sign, a plain office closer, a mineral ceiling tileNo catalogue row for that productquote on inspection

You pay S$550 to S$1,200 only when the photo is that demountable adjustment. A new wall is quote on inspection. The hour is not a way to sneak a room into a call-out.

Ways to keep the bill smaller

Ways to keep the bill smaller

  • Use the demountable you already have. A new wall is the slow, uncertain spend.
  • Fix the glass door before you rebuild the suite. Alignment is the smaller row.
  • In a flat, ask V On about the permit before you buy studs.
  • If you need quiet, price the soundproofing page. Do not add a room to get quiet.

WhatsApp the photos to +65 8561 0630.

Price, or quote on inspection

Only the demountable sentence is a partition price. The neighbours are other jobs.

Anything not in that table is quote on inspection.

Scope already published2026 band in the repoWhere it lives
Demountable partition adjustmentS$550 to S$1,200Commercial glass page
Glass door alignmentS$250 to S$420Commercial glass
Floor springS$450 to S$850Commercial glass
One partition removed at lease endS$550 to S$1,300Reinstatement, a different direction
Acoustic door sealS$280 to S$550Soundproofing page
Rockwool infillS$850 to S$1,950Soundproofing page
Phone booth relocationS$450 to S$1,400Furniture assembly
New roomquote on inspectionNo metre rate
A legality certificateNot offeredURA, HDB, MCST, SCDF

WhatsApp the photos to +65 8561 0630. The reply uses a band already printed on HomeySG, or it says quote on inspection.

A meeting room enclosed by glazed partitions
A glazed meeting room. Adjusting this kind of suite is not the same as building a bedroomPhoto: Jalso Music App, CC BY-SA 4.0, via Wikimedia Commons. A glazed meeting room. It is not a Singapore office and not a priced partition.

Related pages

Frequently Asked Questions

How much does it cost to partition a room in Singapore?

Adjusting an existing demountable office suite is S$550 to S$1,200. A new wall has no published price. There is no per-foot rate and no standard thickness in this catalogue.

Is a partition room legal in Singapore?

We do not certify that. URA asks private owners who rent to keep the approved internal layout. An HDB layout change needs a permit. A wall that ruins an exit is a fire problem. Read those rules for your building.

Can I partition a room in HDB?

A new layout is permit work through V On Construction. The permit guide records fines up to S$5,000 for unauthorised work. A freestanding screen is not the same as a room. Ask before the studs arrive.

How can I partition my living room into a bedroom?

Treat it as a possible layout change, not as a furniture visit. In a private home that is rented, URA’s layout note applies. We will not build a room for stays under three months.

Do I need HDB approval to rent out a room?

HDB’s rental rules are HDB’s. We do not process them. A partition does not create that approval.

How much does it cost to soundproof a room in Singapore?

Door seals start at S$280 to S$550. Rockwool partition infill is S$850 to S$1,950. Secondary glazing is up to S$2,800 on that page. None of those prices is a new bedroom.