What lease-end reinstatement costs when the bands are real

Lease-end reinstatement is priced by scope. Micro-reinstatement is S$1,800 to S$4,500. About 300 sq ft stripped out is S$3,000 to S$7,500. About 800 sq ft is S$8,000 to S$20,000. There is no per-square-foot rate on this site.

4.9

trusted by 500+

An emptied office with a suspended ceiling grid and bare floor

Photo: Np6824, CC BY-SA 4.0, via Wikimedia Commons. An emptied office with a tile grid. It is not a Singapore lease handover and not a measured reinstatement.

HDB licensed renovation contractor badge
Warranty satisfaction badge
Singapore service badge

How it works

  1. 1

    Send the yield-up clause, or the landlord’s list, and photos of what must come out.

  2. 2

    We match micro-reinstatement, a 300 sq ft strip-out, or an 800 sq ft office to those bands, or we say quote on inspection.

  3. 3

    A new fit-out for the next tenant is not included. Signs need their own permission.

  4. 4

    You confirm before demolition starts. We do not negotiate the deposit.

What this job is

Last updated 31 October 2026.

1. Read yield-up 2. List removals 3. Match a band 4. Leave the grid usable
Read the clause, then measure the work

At the end of a Singapore shop or office lease the landlord’s agent walks around with a clause that usually says the tenant must reinstate. The argument is about what that word covers. This catalogue answers with scopes, not with a rate per square foot. People still ask for the average cost per square foot, the estimated cost of an office reinstatement contractor, and what happens when a lease is surrendered. The first two get the bands below. The third is a legal question we do not answer.

Micro-reinstatement is S$1,800 to S$4,500. The reinstatement page describes it as making good nail and screw holes, removing a short run of trunking or a feature panel, patching paint, and leaving the ceiling grid usable. It is the end-of-lease scope that is smaller than a strip-out. If your landlord wants the ceiling removed, the partitions gone, and the floor back to bare screed, you are no longer in that sentence.

A small shop or office of about 300 sq ft that needs a real strip-out is S$3,000 to S$7,500. An office of about 800 sq ft is S$8,000 to S$20,000. Debris clearing is from S$300. A false ceiling removed is S$300 to S$700 a room. One partition removed and made good is S$550 to S$1,300. Those are the lines. Dividing S$7,500 by 300 and calling the result “the market rate” is your arithmetic, not a published rate. The next unit will not match it.

Curtains, blinds and roller shades are not part of this booking.

How the work is done

Start with the clause and the landlord’s marked plan. Highlight only what must be removed or made good. A scuff the next tenant will paint anyway is not always in the clause. A sign, a kitchen, a raised floor and a gypsum room usually are. Photograph each highlighted item. The quote should be able to point at the photo and the clause line together.

Holes from removed signs and shelves, when they are small and the board is sound, can be the hole patch at S$150 to S$280 each time that sentence matches. A wall of holes after a directory comes down may be the micro scope instead of thirty call-outs. Say which. Paint is patch paint inside the micro sentence, not a designer recolour for the next brand. A full repaint has no band on the reinstatement page.

Ceiling grid: “usable” means tiles sit, hangers are intact, and the next person can lift a tile. It does not mean a new designer ceiling. Screwing tiles shut so they look tidy fails the handover the first time someone needs the void. A plasterboard section that is rotten from a leak is S$250 to S$650 after the leak has stopped, and it may sit inside or beside the micro price. Do not assume it is included. Ask.

A partition that was added during the lease comes out under the single-partition row, S$550 to S$1,300, when that is truly one partition made good. A floor of rooms is the 300 or 800 sq ft sentence, or quote on inspection if the photos do not match those sizes. Glass demountable adjustment while you are still in occupation is a different job, S$550 to S$1,200, and it is not demolition.

Industrial units are easy to misquote from the office bands. JTC, Ascendas or Mapletree B1 and B2 minor reinstatement is S$1,200 to S$4,800: anchors ground off, floor patch, DB labels, washroom and office touch-up. That is not an 800 sq ft CBD strip-out, and the CBD figure is not a factory. Use the page that names the building.

What you should see at the endWhat a sloppy visit leavesWhy it matters
The grid can be lifted and is completeTiles screwed down or missingThe landlord’s agent will lift one
Holes are filled and paint is a patch, not a new schemeA feature wall left because it “looks expensive”The clause usually wants the previous condition
Services that were added are removed back to the original pointDead cables left in the voidDead cables fail a sensible handover
Photos match the invoice linesA lump sumThe deposit conversation needs the photos

How to scope it

Send the clause, the area, and whether the landlord wants bare shell or “as found at the start”. Those are different volumes of work. A 300 sq ft shop with a kitchen to strip is not the same as a 300 sq ft office with two picture hooks. If you only have the hooks, do not buy the strip-out. If you have the kitchen, do not buy the micro sentence and hope.

Keys, deposits and early termination are not scoped here. “What happens when a lease is surrendered?” and “can a landlord terminate early?” need the lease and, if you need advice, someone who is allowed to give it. We are not that person. A 99-year lease running out is a tenure question, not a week of making good.

What you seeWhat to photographStop
Hooks, a short trunking run, patch paint, grid intactMicro listS$1,800 to S$4,500
Shop of about 300 sq ft, fittings to stripStrip-out listS$3,000 to S$7,500
Office of about 800 sq ft back to shellThe larger bandS$8,000 to S$20,000
One added partitionThat rowS$550 to S$1,300
Factory unit, anchors and a floor patchIndustrial pageS$1,200 to S$4,800
You want a per-square-foot numberDo not invent oneQuote on inspection if none of the scopes match

Which job you actually have

Match the landlord’s list to a scope. If it matches none, the answer is quote on inspection.

SituationUse thisLeave this alone
Small make-good, grid staysMicro S$1,800 to S$4,500Not a full strip
About 300 sq ft strippedS$3,000 to S$7,500Not a square-foot formula
About 800 sq ft officeS$8,000 to S$20,000Not the micro price
One partitionS$550 to S$1,300Not “partitions” in the plural
Ceiling removed, per roomS$300 to S$700Not included by silence
Debris onlyFrom S$300Not the whole reinstatement
JTC or REIT factoryS$1,200 to S$4,800 minorNot the CBD office band
Next tenant’s new fit-outOffice renovation, separate quoteNot yield-up

Questions a business should ask

Questions a business should ask

Ask the contractor and ask the landlord. The two answers should describe the same rooms.

  1. Does the clause want bare shell or the original condition?
  2. Which published scope is the quote: micro, 300 sq ft, 800 sq ft, or quote on inspection?
  3. Is the ceiling grid to remain usable, or to be removed?
  4. How many partitions come out, and is each one the S$550 to S$1,300 row?
  5. Are sign holes inside the price?
  6. Is the building a factory with a JTC-style list instead?
  7. Will hacking or a structural opening need a qualified person?
  8. Are you also being asked to build the next tenant’s fit-out? That is a second quote.
  9. Who holds the deposit, and are you expecting us to argue it? We will not.

Shop, office, mall, factory

The same square footage can be three different jobs.

PlaceTypical yield-upBand if it matchesExtra rule
Small officeHoles, trunking, paint, gridS$1,800 to S$4,500Landlord’s agent will lift a tile
Shop about 300 sq ftStrip fittingsS$3,000 to S$7,500Food shops may have a grease trap to reinstate
Office about 800 sq ftShellS$8,000 to S$20,000Do not scale this by mental arithmetic
MallMall reinstatement rules plus these bands if the scope matchesPlus night access if they demand itS$380 to S$650 is the night slot, not the strip-out
JTC or REIT factoryAnchors, floor, labels, washroomS$1,200 to S$4,800Not a shophouse price

Rules that apply

BCA’s guide on building works that do not need approval is the checkpoint when reinstatement becomes demolition of structure rather than fittings. Insignificant works are in the First Schedule. A qualified person advises. Removing a tenant’s gypsum lining is often fittings. Cutting a new opening, or making good a structural chase, may not be. We stop at that line. V On Construction carries an HDB renovation permit when the premises are a flat and the work needs one. A shop is not assumed to be that flat.

SCDF still cares that an exit door and a fire shutter work on the day you hand the keys back. Do not remove a closer and leave the door off its latch as “reinstated”. NEA and SFA premises rules matter if a food shop’s tiles or cove are part of what the landlord wants put back. The F&B page prices repairs. It does not surrender the licence.

Surrender, early termination, and the end of a 99-year lease are not priced. URA and the contract govern those. Our photos and invoice are the record of the physical work only.

Official pages

Homey Furnishing Pte. Ltd. (ACRA UEN 202018148K), 27 Mandai Estate, #06-10 Innovation Place, Singapore 729931, invoices the permit-exempt visit. V On Construction Pte. Ltd. (ACRA UEN 201611708H), on the HDB Directory of Renovation Contractors, invoices hacking, a new layout, and an HDB renovation permit. Homey Furnishing is not a property agency, not a CEA practice, and not a MOM-licensed employment agency.

How you're charged

How you're charged

A job that already has a sentence on HomeySG uses that sentence. The hour is not added on top of a band unless the written scope says so. There is no fuel surcharge and no published night premium except the mall overnight row.

ChargeWhat it covers2026
Per hourPermit-exempt handyman time after a priced task, if the scope says soS$45/hr
Minimum, one taskOne permit-exempt task on one visitS$55
Mall overnightPermit-to-work admin and one hardware fix when the mall requires the night slotS$380 to S$650
A matching catalogue rowThe photo matches a row already printedThat row
A term contract, a sign, a plain office closer, a mineral ceiling tileNo catalogue row for that productquote on inspection

You are charged the scope that matches the clause. Micro is not a deposit against the 800 sq ft band. If the walk reveals a kitchen the clause requires out, the quote changes before demolition, not after.

Ways to keep the bill smaller

Ways to keep the bill smaller

  • Highlight the clause. Paying to remove a feature the landlord is silent about is optional. Paying to leave one the clause names is not.
  • Fill small holes under the hole row when that is all there is. Do not buy a strip-out for picture hooks.
  • Leave the grid liftable. Screwing it shut creates a defect.
  • Separate the next tenant’s fit-out. Combining it with yield-up hides both prices.

WhatsApp the photos to +65 8561 0630.

Price, or quote on inspection

Every figure below is already on the reinstatement, ceiling, mall or industrial page.

Anything not in that table is quote on inspection.

Scope already published2026 band in the repoWhere it lives
Debris clearingFrom S$300Reinstatement
False ceiling removed, per roomS$300 to S$700Reinstatement
One partition removed and made goodS$550 to S$1,300Reinstatement
Micro-reinstatementS$1,800 to S$4,500Reinstatement
About 300 sq ftS$3,000 to S$7,500Reinstatement
About 800 sq ftS$8,000 to S$20,000Reinstatement
Small holeS$150 to S$280If that sentence matches
Board sectionS$250 to S$650Ceiling page
JTC minor reinstatementS$1,200 to S$4,800Industrial page
Per square footquote on inspectionNot published

WhatsApp the photos to +65 8561 0630. The reply uses a band already printed on HomeySG, or it says quote on inspection.

An emptied office with a suspended ceiling grid and bare floor
An emptied office and its ceiling grid. Usable grid is part of the micro scopePhoto: Np6824, CC BY-SA 4.0, via Wikimedia Commons. An emptied office with a tile grid. It is not a Singapore lease handover and not a measured reinstatement.

Related pages

Frequently Asked Questions

What is the estimated cost of an office reinstatement contractor in Singapore?

Micro-reinstatement is S$1,800 to S$4,500. About 300 sq ft stripped out is S$3,000 to S$7,500. About 800 sq ft is S$8,000 to S$20,000. The scope has to match the sentence.

What is the cost of reinstatement?

The same bands. Debris clearing is from S$300. One partition is S$550 to S$1,300. A false ceiling removed is S$300 to S$700 a room. There is no single “reinstatement cost”.

What is the average cost of reinstatement per square foot in Singapore?

None is published. Do not divide a band by an area and treat the result as a rate for the next unit.

What happens when a lease is surrendered?

That is the lease and, if you need advice, a lawyer. We price the physical make-good described in the clause. We do not advise on surrender.

What happens when a 99 year lease expires in Singapore?

Tenure is not a handyman scope. Yield-up of a shop fitting during the lease is the bands on this page. The expiry of the land lease is a different subject.

Can a landlord terminate a lease early in Singapore?

We do not advise on termination. If you are leaving, send the clause and the photos and we will price the work.

How much does it cost to demolish a property in Singapore?

Demolishing a building is not these bands. Tenant strip-out of fittings is the 300 sq ft and 800 sq ft sentences when they match. Structural demolition needs a qualified person and is quote on inspection.

Tell us what you need help with

This opens WhatsApp with your details filled in. You can attach photos there for a faster quote. See our privacy policy.

Prefer to call? +65 8561 0630