Cap the gas, then cut the stone, then give the hob its own circuit

Swapping a gas hob for induction in Singapore is three trades in one opening. A City Energy licensed gas service worker caps the gas, or the LPG cylinder leaves. A 13A hybrid hob can use a socket. A full induction hob needs a 20A or 32A circuit in 4mm or 6mm cable. The quartz cut is S$250 to S$550 with wet HEPA extraction. The hob and the circuit are extra. The opening is not a DIY grinder cut.

4.9

trusted by 500+

Kitchen stone worktop in a Singapore home before an induction hob cutout
HDB licensed renovation contractor badge
Warranty satisfaction badge
Singapore service badge

Executive summary and why it fails

Swapping a gas hob for induction in Singapore is three trades in one opening. A City Energy licensed gas service worker caps the gas, or the LPG cylinder leaves. A 13A hybrid hob can use a socket. A full induction hob needs a 20A or 32A circuit in 4mm or 6mm cable. The quartz cut is S$250 to S$550 with wet HEPA extraction. The hob and the circuit are extra. The opening is not a DIY grinder cut.

City Energy supplies piped gas in the flats that have it. The pipe is capped by a licensed gas service worker, and the certificate is what makes the induction swap legal rather than a hose pushed behind the cabinet. An LPG cylinder is a different fuel. The cylinder is disconnected and removed. It is not stored in the same cabinet as the new hob. Either way the gas is finished before the stone is cut, so a spark from a grinder is not a story. The old gas tap is not a cable entry.

A hybrid induction hob that is sold as plug-and-play may sit on a 13A socket if the manufacturer says so and the socket is a real radial, not an adaptor on the rice-cooker point. A full-width induction hob is commonly 20A or 32A. The cable is 4mm squared for many 20A circuits and 6mm squared for 32A, on a dedicated breaker, with the RCCB type discussed in the power-trip guide because inverter hobs produce residual current a Type AC device may not see. Sharing the oven circuit is how both appliances trip at dinner. The electrician sizes the cable. A longer extension lead is not a size.

Quartz and sintered stone are cut wet with a diamond blade and HEPA extraction because the dust is fine and, for many quartz products, it contains respirable crystalline silica. A dry cut coats every room and can crack the slab at a sharp internal corner. A stainless adapter trim is the alternative when the new hob is smaller than the old cutout, or when the old cutout is only slightly out and a trim frame closes the gap without enlarging the hole. Enlarging is right when the new pan support is wider. A trim is right when you are going smaller. The cutout checker asks for both sets of dimensions before anyone books the blade.

Homey Furnishing Pte. Ltd. (ACRA UEN 202018148K), 27 Mandai Estate, #06-10 Innovation Place, Singapore 729931, carries the permit-exempt portion of this work. V On Construction Pte. Ltd. (ACRA UEN 201611708H), listed on the HDB Directory of Renovation Contractors, carries any scope that needs an HDB renovation permit. Those two invoices are not interchangeable. Piped gas is capped by a City Energy licensed gas service worker. A new dedicated circuit is an EMA licensed electrician. The wet cut and the cabinet support are permit-exempt if the kitchen layout does not change. A new kitchen layout is V On Construction Pte. Ltd. UEN 201611708H.

Ten-minute diagnostic: safe check versus stop

Spend ten minutes with a torch, your phone camera, and a tape before you buy a product or book a hack. Write down what you see. The safe checks below do not ask you to open a live wire, cut a pressurised pipe, or lean out of a window. Measure the existing cutout, the new hob cutout, the distance to the sink and to the front edge, and the route from the DB to the hob. Photograph the gas point and the existing socket.

Stop at the red-flag column. Stop if gas is still connected, if the cut would leave less stone than the slab needs, or if the only power plan is an extension lead. The reason DIY fails is almost never a lack of effort. It is that the tool or chemical makes the next professional repair harder, or it hides a leak, a live conductor, or a deposit line until the damage is larger than S$250 to S$550 for the cut. The circuit and the gas cap are separate lines..

Symptom or measurementSafe DIY checkRed flag: stopWhy DIY fails
New hob is larger than the old cutMeasure both cutouts and the margin to the sinkThe margin is under the manufacturer minimumThe stone cracks between hob and sink. That is a new top
New hob is smallerAsk whether a stainless trim frame will close the gapYou plan to fill the gap with siliconeSilicone is not a support and it stains
Flat has piped gasDo not remove the hob and leave an open pipeAnyone offers to cap it without a gas licenceAn open or amateur cap is a City Energy incident
Only a 13A socket nearbyRead the hob manual for plug-and-playThe manual asks for 32A and the quote uses the socketThe socket overheats. The cable size was the point

Professional on-site sequence

This is the sequence a careful technician uses so you can tell a shortcut from a finished job. Tools stay in the van. Readings and photos go on the same worksheet as the price. Wet diamond cutter, HEPA extraction, stone tape and support, stainless trim if the hole is not being enlarged, and the electrician’s cable and breaker for the circuit the manual names. The gas worker caps before the blade starts.

  1. Step 1. Make the area safe and confirm the symptom still matches the photos. For Cap the gas, then cut the stone, then give the hob its own circuit, that means Stop if gas is still connected, if the cut would leave less stone than the slab needs, or if the only power plan is an extension lead.
  2. Step 2. Measure before touching the finished surface. Measure the existing cutout, the new hob cutout, the distance to the sink and to the front edge, and the route from the DB to the hob. Photograph the gas point and the existing socket.
  3. Step 3. Set protection and lay out the tools that belong to this material. Wet diamond cutter, HEPA extraction, stone tape and support, stainless trim if the hole is not being enlarged, and the electrician’s cable and breaker for the circuit the manual names. The gas worker caps before the blade starts.
  4. Step 4. Carry out the repair in the order the material allows. a dry cut cracks the slab or dusts the flat, the gas is left uncapped, or a 32A hob is plugged into a 13A socket is the failure this order is written to avoid.
  5. Step 5. Test in place. The gas certificate or the LPG removal is in the pack. The hob heats on its own breaker. The cut edge is clean, the trim is tight if there is one, and the cabinet below is not full of slurry.
  6. Step 6. Clean, label the photographs against the invoice lines, and leave the statutory openings, weep holes, access panels and labels visible.

The order matters because a dry cut cracks the slab or dusts the flat, the gas is left uncapped, or a 32A hob is plugged into a 13A socket is what happens when a step is rushed. Handover is a measurement, not a handshake. The gas certificate or the LPG removal is in the pack. The hob heats on its own breaker. The cut edge is clean, the trim is tight if there is one, and the cabinet below is not full of slurry. If the reading or the water test fails, the visit is not closed and a second line is priced before anyone leaves. Permit work, if the diagnosis has moved into hacking, waterproofing, or a new layout, stops here and is repriced through V On Construction Pte. Ltd. UEN 201611708H.

2026 price, brand and lifespan

Price the cut, the gas and the circuit as three lines. A package that hides one of them is how the hob sits in the doorway for a week. Prices below are 2026 Singapore bands for the described scope. They are not a coupon and they are not a guess after an unopened door. A second trade, such as a PUB licensed plumber or an EMA licensed electrician, is named when the law requires it rather than buried inside the labour line. Compare rows by what they include. The planning-life column belongs to that row only.

2026 SGD scope bands

ScopeWhat you are paying for2026 SGD bandPlanning life
Wet cut to enlargeDiamond cut, HEPA, support, make good the edgeS$250 to S$550The top you already own
Stainless trim frameWhen the new hob is smallerS$180 to S$380Avoids a cut
Gas cap by LGSWPiped gas made safe, certificateS$150 to S$350The legal end of the gas
20A or 32A circuit4mm or 6mm cable, dedicated breakerS$350 to S$900The life of the hob

Brand, material and lifespan

OptionWhere it is used in SingaporeFailure mode in humidityPlanning life
13A hybrid hobSmall households, genuine plug-and-play manualsNot a 4-zone 7kW hobOnly if the manual agrees
20A inductionMost 2 and 3 zone swapsUndersized if the manual says 32A4mm cable is the common match
32A inductionFull-width cookingNeeds 6mm cable and spare board capacityDo not share the oven
Quartz versus sinteredThe top you are cuttingSharp corners crack sintered stone. Quartz dust needs HEPAFollow the cutout checker

Run the hob cutout checker, then book the cooker hood and hob service. The hood duct is a separate measurement if the new hob is deeper.

Three Singapore property case studies

Three worked jobs show how the same symptom is priced differently in a new BTO, an older resale flat, and a private condo or landed house. The totals are the lines a household actually paid, not a national average. Permit-exempt invoices are issued by Homey Furnishing Pte. Ltd. UEN 202018148K.

Case 1: 4-room BTO in Tengah

Piped gas was capped by a licensed gas worker for S$220. The induction hob was a true 13A hybrid and the socket was a radial. A stainless trim closed a slightly larger old cutout for S$260. No new circuit. Half a day.

Case 2: 28-year resale flat in Bedok

The new hob needed 32A. The wet cut was S$420. The 6mm circuit from a tired board was S$780. The gas cap was S$250. Total S$1,450 before the hob the owner had bought. The dry-cut option was refused because the flat was occupied.

Case 3: landed house in Serangoon

LPG cylinders were removed. A 3-phase supply made the 32A circuit simple. The sintered top was cut wet with rounded internal corners for S$550. A sharp-corner template from the hob carton was redrawn before the blade started, which is why the slab survived.

Frequently Asked Questions

Who caps the gas?

A City Energy licensed gas service worker caps piped gas and issues the record. An LPG cylinder is disconnected and removed, not left in the cabinet. Homey Furnishing does not treat a push-on cap as finished.

Can I use a normal 13A socket?

Only if the hob manual is written for 13A plug-and-play and the socket is a real circuit. A 20A hob needs about 4mm squared cable. A 32A hob needs about 6mm squared cable and its own breaker. An extension lead is neither.

Why is the cut wet?

Quartz dust contains fine silica and it travels. A wet diamond cut with HEPA extraction keeps it out of the flat and cools the blade. A dry grinder is how the slab cracks and the rooms turn white.

When is a stainless trim better than a cut?

When the new hob is smaller than the old hole. The trim closes the gap and carries the rim. Silicone does not. When the new hob is larger, the stone is cut, provided the margin to the sink is still safe.

Does the kitchen need an HDB permit?

Not for a cutout and a circuit in the same layout. A new kitchen layout is V On Construction Pte. Ltd. UEN 201611708H. The electrician and the gas worker carry their own licences either way.

What should I budget besides the hob?

The wet cut is S$250 to S$550. A gas cap is S$150 to S$350. A new circuit is S$350 to S$900. A trim instead of a cut is S$180 to S$380. Price them as separate lines.

Tell us what you need help with

This opens WhatsApp with your details filled in. You can attach photos there for a faster quote. See our privacy policy.

Prefer to call? +65 8561 0630