HDB shop rules are not the flat permit

An HDB shop uses HDB’s commercial renovation guide, not the flat permit. New shelves, finishes and doors need a Notice of Alteration. Works outside the exemption list need a qualified person on CORENET. The town council is for common property and the external colour, not for the interior fit-out.

4.9

trusted by 500+

Shops under a covered walk at an outdoor mall in Toa Payoh Central

Photo: Wzhkevin, CC BY-SA 4.0, via Wikimedia Commons. Toa Payoh Central on 16 April 2022. It is a place, not a HomeySG repair and not a permit.

HDB licensed renovation contractor badge
Warranty satisfaction badge
Singapore service badge

How it works

  1. 1

    Read the clause that applies to your premises before you book a fitting.

  2. 2

    Match a printed band only when the photo is that fitting. Otherwise the answer is quote on inspection.

  3. 3

    Name the licensed party where the work is regulated. We do not sign the licence.

  4. 4

    Confirm the scope in writing. A guide is not an invoice.

What this job is

Last updated 31 October 2026.

1. Confirm it is an HDB shop 2. Exempt item or not 3. NOA or a qualified person 4. Town council only if it is common property
Flat permit, shop NOA, or CORENET

Search “HDB renovation permit” and the first pages are about flats: the form on the HDB app, Saturday rules written for homes, and a permit fee people quote from a renovation blog. An HDB shop, whether rented or sold, is in a different handbook. The Renovation Guide for Shop Tenant/Owner, dated December 2025, is issued by the Commercial Asset Management Department. HDB says the guide is current at issuance and can change, and that it does not override the tenancy agreement or the memorandum of lease. If the PDF and a letter from the branch disagree, the letter wins. This page describes the guide as it stood when we read it on 31 October 2026.

People also ask whether shophouses are under HDB. Some neighbourhood shops are HDB commercial premises. A conserved shophouse on a private title is not, and URA’s conservation rules sit on that building. The way to tell is the title and HDB’s own correspondence, not the presence of a roller shutter. We are not a property agency and we do not look up titles. If you are unsure, say so before anyone drills. Applying a flat permit to a private shophouse, or a shophouse’s conservation rule to an HDB shop, is how the wrong drawing gets built.

People also ask what a shop renovation costs, how much the permit costs, and how long approval takes. There is no shop-renovation package and no permit fee in our catalogue. HDB’s guide mentions a fee when additional electrical load is granted, and it does not print the amount. We will not copy a flat-permit fee into that blank. On time, the public A&A page says a lodgement is likely to take 7 working days and an A&A application 14 working days, subject to review. The December 2025 guide’s table describes exemption-list items as a lodgement to notify HDB with instant approval, and you still obtain the Notice of Alteration before work starts. Those are different sentences on different HDB pages. Read the one that matches your item. Do not add the two clocks together and call it three weeks.

Curtains, blinds and roller shades are not part of this booking. A roller shutter is a different product and stays on the shutter page.

How the work is done

Sort the work before you sort the contractor. HDB says fitting-out needs prior approval under the tenancy or the memorandum of lease. A qualified person, a registered architect or a professional engineer, submits what is not exempt, through CORENET, for clearance from HDB, BCA and FSSD. Nothing starts until those clearances exist, and copies go back to HDB for record. The contractor for alteration and addition is to be on the HDB Directory of Renovation Contractors. V On Construction Pte. Ltd. UEN 201611708H is the company named on this site for that permit path. Homey Furnishing invoices the permit-exempt visit. It does not submit CORENET.

The exemption list is not a free pass. The guide says those items generally do not affect structural safety, or they sit under FSSD directly, such as partitioning and fire compartmentation, so they are not submitted on CORENET. You still lodge the Notice of Alteration at go.gov.sg/hdb-noa-application before you start, and you display it outside for the whole job. The guide’s own examples of minor works that need the notice are laying floor or wall finishes, installing shelves or racks, and replacing doors or windows. “Minor” in that sentence means “not a CORENET set”, not “no paper”.

The town council enters when the fixing leaves the unit. Retractable awnings, lightings, signboards and LPG on common property need town council clearance first. External wall paint follows the town council colour. Facade walls without a corridor in front follow the building colour. A different colour is only described for the recessed main entrance, up to 3 m each side, and for recessed side and rear entrances. Interior racks do not go to the town council. Asking the town council to approve a new kitchen layout wastes the week HDB was going to use.

What you should see at the endWhat a sloppy visit leavesWhy it matters
The NOA is on the shutter before the first holeDrilling because someone said minor work is exemptThe guide requires the notice for shelves and finishes
A qualified person has signed the drawings that are not exemptA supplier’s sketch treated as CORENETHDB wants the qualified person’s submission
Common-property fittings have the town council’s replyAn awning bracket in the corridorThe corridor is not the tenancy
Debris leaves daily and does not enter the chute or the sewerTiles in the refuse chuteThe guide names that discharge

How to scope it

Write the list in two columns: repair of a fitting that is already there, and new work. A shutter limit, a glass-door alignment and a silicone joint can be the printed rows on the shop handyman page if that is all they are. A new floor, a new rack and a new door are the notice. A wall coming out is the qualified person. Do not ask one contractor to price the three columns as “shop reno”.

Add the trade. Food, laundry, a gym and a cakeshop have extra lines in the guide: grease traps and exhaust for an eating house, a PE letter for gym loads, exhaust drawings for a cakeshop. A minimart is not a gym. Say the use. If the use is changing, HDB wants in-principle change-of-use approval first, and a PE if the new use loads the floor more than the original design. If the fire-code purpose group changes, the guide points you to SCDF as well. A music school and a minimart are the example HDB gives of two purpose groups.

What you seeWhat to photographStop
You only have a flat permit PDFThe shop address and the tenancyStop. Get the commercial path
The work is shelves, a new floor, or a new doorThe NOA screenDo not start on a verbal exemption
The bracket is on the common corridorThe town council, not only HDBDo not drill the corridor
Someone asks the permit feeHDB’s letter, not a blogWe do not publish a fee the guide does not print

Which job you actually have

Pick the column before you pick the contractor.

SituationUse thisLeave this alone
Existing hinge, shutter or siliconePrinted repair rowsNot a renovation package
New shelves, finishes, doors or windowsNotice of Alteration firstNot “minor, so no paper”
Layout, structure, or work outside the exemption listQualified person, CORENET, directory contractorNot a handyman hour
Awning, sign, light or LPG on common propertyTown councilNot an interior NOA by itself
External wall colourTown council schemeNot the brand colour on the whole facade
Change of use or a heavier floor loadHDB in-principle approval, and a PE if the load risesNot a paint job

Questions a shop should ask

Questions a shop should ask

Ask the contractor which column they are pricing.

  1. Is this premises an HDB shop, a private shophouse, or both in the way the title is unclear?
  2. Is the item on HDB’s exemption list, or does it need CORENET?
  3. Where is the Notice of Alteration?
  4. Is the contractor on the Directory of Renovation Contractors for alteration and addition?
  5. Does any fixing land on common property?
  6. What is the approved electrical load, and is a fee for extra load still unknown?
  7. Is the use changing in a way that changes the fire-code purpose group?
  8. Are you being quoted a permit fee? Ask which HDB page prints it.

Shop, shophouse, or a flat someone is using as a shop

A shutter does not tell you the statute.

QuestionHDB shopConserved private shophouseHDB flat used as a shop
Interior fitting-outHDB commercial guideLandlord and URA conservation. Not this NOAThe flat permit may be the real document. Say so
Town councilCommon property and external colourNot automatically the HDB town council pathCommon property is still the town council
HoursShop guide: noisy work on weekdaysThe lease, and conservation conditionsThe flat hours people already know are a different page
Who invoices a permitV On for the directory pathWhoever the conservation approval namesV On only if it is actually that permit

Hours, debris and the trades

General renovation that does not generate noise, including plastering, screed, painting and similar work, is 9am to 6pm, Monday to Saturday. Sunday and public holidays are off. Noisy work, including demolishing walls, removing finishes, cutting tiles and excessive drilling, is 9am to 5pm, Monday to Friday. It is also kept off the eve of New Year’s Day, Chinese New Year, Deepavali, Hari Raya Puasa and Christmas Day. Workers need personal protective equipment. Demolition workers are to be certified by the BCA Academy. The site is hoarded. Those are the guide’s conditions on the registered contractor, not a slogan.

Debris stays out of the staircase, the rainwater pipe, the sewer, the refuse chute and the pneumatic system. It is not left in the corridor overnight. A skip on a car park needs the branch’s approval, payment, and a notice on the skip. Water, electricity and gas accounts are opened before fitting-out. Water pipe services are a PUB licensed plumber. Gas and electrical work are an EMA licensed worker. Windows that are installed, retrofitted, repaired or replaced are a BCA-approved window contractor listed with HDB, and the guide states a fine of up to S$10,000 and a jail term of up to one year, or both, if a window falls for lack of maintenance.

An eating house maintains its grease trap and exhaust and keeps the receipts. The hood and duct are degreased at least every 12 months by an exhaust specialist. A gym needs a PE letter on the floor load and pays for strengthening if the original design is too light. A shelter alteration, including aircon, needs FSSD first. Exit lights, alarms, hose reels and extinguishers are maintained to FSSD’s standard. None of those sentences is a price. The prices, where we have them, are on the fitting pages.

What people ask about permits

“How do I know if my contractor is HDB approved?” The guide points at the Directory of Renovation Contractors for alteration and addition. Check the directory. A handyman invoice from Homey Furnishing is not that listing. “How to report renovation without a permit?” is an enforcement question. The guide’s feedback route is go.gov.sg/hdb-write-to-us. We do not run a report hotline and we do not inspect a neighbour’s unit.

“What are the permitted renovation hours for HDB?” has two answers, and people paste the flat one onto a shop. Use the shop table above for a shop. The flat page on this site remains the flat page. “What is addition and alteration?” on the commercial page is the CORENET set: drawings, a qualified person, and clearances. It is not a synonym for every screw.

Periodic structural inspection of a commercial block is described as once every five years. Cladding on a column may have to come off for the engineer, at the tenant’s cost. Do not box a column and call it joinery. Works that hack beams or columns, alter the external reinforced-concrete facade, convert living quarters without approval, or use flickering sign lights are on the guide’s do-not list.

Rules that apply

The sources are HDB’s shop renovation pages and the December 2025 PDF, plus BCA where a window or a structural question appears, and EMA where the electrical load does. SCDF enters when the purpose group changes or when fire safety works are part of the fit-out. This page does not restate the Fire Code. The fire guide does.

Homey Furnishing is not the town council and not HDB. We do not grant the NOA, we do not approve a colour, and we do not charge a permit fee of our own. V On Construction is the directory contractor this site names when the work is the permit path. A disagreement about price or workmanship is, in HDB’s own words, a private matter between tenant and contractor, with CASE, the Small Claims Tribunals or the courts as the routes the guide mentions. We do not offer to sit as the tribunal.

Official pages

Homey Furnishing Pte. Ltd. (ACRA UEN 202018148K), 27 Mandai Estate, #06-10 Innovation Place, Singapore 729931, invoices the permit-exempt visit. V On Construction Pte. Ltd. (ACRA UEN 201611708H), on the HDB Directory of Renovation Contractors, invoices hacking, a new layout, and an HDB renovation permit. Homey Furnishing is not a property agency, not a CEA practice, and not a vector-control operator.

How you're charged

How you're charged

A job that already has a sentence on HomeySG uses that sentence. The hour is not added on top of a band unless the written scope says so. There is no fuel surcharge and no published night premium except the mall overnight row. A shop does not inherit a flat’s price just because the fitting looks similar.

ChargeWhat it covers2026
Per hourPermit-exempt handyman time after a priced task, if the scope says soS$45/hr
Minimum, one taskOne permit-exempt task on one visitS$55
Mall overnightPermit-to-work admin and one hardware fix when the mall requires the night slotS$380 to S$650
A matching catalogue rowThe photo matches a row already printedThat row
A gondola run, a cassette aircon, a full shop repaint, a camera, a floor trap sizeNo catalogue row for that productquote on inspection

Reading the guide is free. A fitting that matches a printed row uses that row. A renovation, a permit fee and a town-council colour change are quote on inspection or HDB’s own bill. We do not add a “paperwork” price.

Ways to keep the bill smaller

Ways to keep the bill smaller

  • Separate repairs from new finishes before you ask for one number.
  • Lodge the notice before the noisy day is booked. A turned-away crew is the expensive hour.
  • Do not ask the town council to approve an interior layout.
  • Do not pay a permit fee you cannot find on an HDB page.

WhatsApp the photos to +65 8561 0630.

Price, or quote on inspection

The rules are HDB’s. The dollars below are only fittings this site already prices.

Anything not in that table is quote on inspection.

Scope already published2026 band in the repoWhere it lives
One permit-exempt taskS$55Handyman page
Shutter track and limitsS$250 to S$480Shutter page
Showcase hardwareS$250 to S$550Mall page
Small hole patchS$150 to S$280Patch row
About 300 sq ft strip-outS$3,000 to S$7,500Reinstatement
Shop permit fee, full fit-out, external repaintquote on inspectionNot printed

WhatsApp the photos to +65 8561 0630. The reply uses a band already printed on HomeySG, or it says quote on inspection.

Shops under a covered walk at an outdoor mall in Toa Payoh Central
Toa Payoh Central. These shopfronts are commercial premisesPhoto: Wzhkevin, CC BY-SA 4.0, via Wikimedia Commons. Toa Payoh Central on 16 April 2022. It is a place, not a HomeySG repair and not a permit.

Related pages

Frequently Asked Questions

What renovation works require an HDB permit?

For a shop, fitting-out needs HDB’s prior approval. Shelves, floor and wall finishes, and replacement doors or windows need a Notice of Alteration. Work outside the exemption list is a qualified person on CORENET. A flat permit is not that approval.

What minor works need a notice of alteration for an HDB shop?

HDB’s December 2025 guide names laying floor or wall finishes, installing shelves or racks, and replacing doors or windows. Exemption from CORENET does not remove the notice.

Does the town council approve HDB shop renovation?

Interior fitting-out is HDB’s. The town council is for fittings on common property, including awnings, lights, signboards and LPG, and for the external wall colour.

Are shophouses under HDB?

Only if they are HDB commercial premises. A conserved shophouse on a private title is not an HDB shop. The title tells you. We do not look it up.

How long does it take for HDB to approve a renovation permit?

The commercial A&A page says lodgement is likely 7 working days and an A&A application 14, subject to review. The shop guide’s table describes exemption-list notification as instant, and you still need the Notice of Alteration before work. Use the sentence that matches the item.

How much is an HDB renovation permit?

No shop-permit fee is printed in the guide we read, except that extra electrical load can involve a fee of an unstated amount. We do not publish a number HDB did not.

What are the permitted renovation hours for HDB?

For a shop, general work is 9am to 6pm, Monday to Saturday. Noisy work is 9am to 5pm, Monday to Friday. Sunday and public holidays are not working days. Flat hours are a different page.

How do I know if my contractor is HDB approved?

Alteration and addition uses the Directory of Renovation Contractors. V On Construction Pte. Ltd. UEN 201611708H is the company this site names for that path. A permit-exempt handyman visit is Homey Furnishing, and that invoice is not the directory listing.

Tell us what you need help with

This opens WhatsApp with your details filled in. You can attach photos there for a faster quote. See our privacy policy.

Prefer to call? +65 8561 0630